(Monday, Oct 23 at 08:45)
(Monday, Oct 23 at 08:45)
Line 9: Line 9:
 
#* RF Recovery only 2h
 
#* RF Recovery only 2h
 
#* TAC run when beam back (HallC Aerogel installation at least 6h; TAC run with foil! Todd and Mike are available nano BPM should still be up and running with valid calibration.
 
#* TAC run when beam back (HallC Aerogel installation at least 6h; TAC run with foil! Todd and Mike are available nano BPM should still be up and running with valid calibration.
 +
#* Empty target in prep for TAC run.
 
# Week forcast
 
# Week forcast
#* Facility development (minimal beam energy spread for hallA beam requirements): Wed. 3pm to Thu. 3pm, detailed schedule will be available by 2:30pm this afternoon
+
#* Facility development (minimal beam energy spread for hallA beam requirements): Wed. 8am to Thu. 3pm, detailed schedule will be available by 2:30pm this afternoon
 
#* [https://halldweb.jlab.org/wiki/index.php/File:Fall18_week5.jpg Week 5]
 
#* [https://halldweb.jlab.org/wiki/index.php/File:Fall18_week5.jpg Week 5]
 
#* [https://halldweb.jlab.org/wiki/index.php/File:Fall18_week6.jpg Week 6]
 
#* [https://halldweb.jlab.org/wiki/index.php/File:Fall18_week6.jpg Week 6]

Revision as of 09:05, 23 October 2018

Monday, Oct 23 at 08:45

  1. Last 24h
  2. Issues
  3. Plan Today
    • RF Recovery only 2h
    • TAC run when beam back (HallC Aerogel installation at least 6h; TAC run with foil! Todd and Mike are available nano BPM should still be up and running with valid calibration.
    • Empty target in prep for TAC run.
  4. Week forcast
  5. AoB

Monday, Oct 22 at 08:45

  1. This past week end
  2. Issues over the week end
    • DAQ, gluon04, No PS-trigger on display (DAQ-trigger ok!)
    • Data Monitoring
    • FCAL performance
    • beam intensity issues this morning 7am .... Moday morning start of the work day
  3. Today:
  4. Week beam forecast
    • Mon. Beam studies, Tue. RF-recovery, Wed.-Thu. Acc. Dev. for HallA
    • Shifts on Standby from Wed. 8am to Thu. 4pm??
    • Week 5
    • Week 6
  5. AoB?

Friday, Oct 19 at 08:45

  1. Notes from the past 24 hours:
    • Alignment of JD70-105 47um in 10 hours. THANKS TO HOVANES!
    • Amo run taken
    • Harp scan taken: same beam conditions as on Wednesday evening
    • PARA and PERP at 0/90 with new diamond in the books!
    • Beam last 24h
  2. Report:
  3. Actions Required:
    • TAKE DATA!
  4. Weekly Beam forecast: CEBAF-WhiteBoard
    • HallA machine development (Tue.-Wed) may shift to Mon.-Tue.!
  5. Run Plan:
    • Run with no radiator at high current (Lubomir)
      • Raw mode, LED (FP) trigger to 5kHz!
    • Week 5
    • Week 6
  6. WTFATRC
    • NEED RC in 2 weeks!
  7. ANY other business

Thursday, Oct 18 at 08:45

  1. Notes from the past 24 hours:
  2. Actions Required:
    • photon beam, coherent peak!
    • need good beam AND diamond for the week end!
  3. Weekly Beam forecast: CEBAF-WhiteBoard
    • Beam studies Monday, HallC 4hour access
    • RF recovery Tuesday, HallC aerogel installation
    • Wednesday 7am(?) to Thursday midnight Hall-A beam tune. No beam or only parasitic other halls.
      • take advantage of down for installations?
    • TAC postpone to Friday 10/26?????
  4. Reports:
  5. Run Plan