Difference between revisions of "Run Planning Meeting Notes, Oct 25-Oct 31, 2018"

From GlueXWiki
Jump to: navigation, search
(Thursday, Oct 25 at 08:45)
(Thursday, Oct 25 at 08:45)
Line 15: Line 15:
 
# Plans
 
# Plans
 
#* Today
 
#* Today
#** Work in hall? Need to go into restricted access?
+
#** Work in hall (stay in controlled access)
#** Set shifts on standby until 8:00am tomorrow?
+
#*** BCAL (Elton)
 +
#*** TOF (Beni)
 +
#*** Walk through(s)
 +
#** Shifts are on standby until 11:59pm today
 +
#** IF beam is back:
 +
#*** Fill target, perform harp scans, check radiation levels, PS-rates,...
 +
#*** Start data taking with AMO @ 180nA
 
#* Upcoming days
 
#* Upcoming days
 
#** Take data as soon as beam is available
 
#** Take data as soon as beam is available
#** Accel. plans RF recovery for Tuesday, need to re-tune one of the cavitis
+
#** Accel.
 +
#*** Beam studies on Monday
 +
#*** RF recovery for Tuesday, need to re-tune one of the cavitis
 
# AoB
 
# AoB

Revision as of 09:41, 25 October 2018

Thursday, Oct 25 at 08:45

  1. Last 24h
  2. Issues and current Status
    • Hall is in controlled access
    • Accell.
      • Extended phaser studies/tests into swing-shift
      • Master Oscillator Modifications (MoMod) ~8h begin in swing-shift
    • Earliest to expect beam: Around owl-shift (i.e. Friday)
  3. Reports
  4. Plans
    • Today
      • Work in hall (stay in controlled access)
        • BCAL (Elton)
        • TOF (Beni)
        • Walk through(s)
      • Shifts are on standby until 11:59pm today
      • IF beam is back:
        • Fill target, perform harp scans, check radiation levels, PS-rates,...
        • Start data taking with AMO @ 180nA
    • Upcoming days
      • Take data as soon as beam is available
      • Accel.
        • Beam studies on Monday
        • RF recovery for Tuesday, need to re-tune one of the cavitis
  5. AoB