Difference between revisions of "Run Planning Meeting Notes, Oct 25-Oct 31, 2018"

From GlueXWiki
Jump to: navigation, search
(Friday, Oct 26 at 08:45)
(Friday, Oct 26 at 08:45)
Line 3: Line 3:
 
#* Shifts were on standby until 8pm
 
#* Shifts were on standby until 8pm
 
#* Hall went into beam permit ~8:30pm
 
#* Hall went into beam permit ~8:30pm
#* Filled target, performed harp scans, checked radiation levels
+
#* Filled target, [https://logbooks.jlab.org/entry/3614961 performed harp scans], checked radiation levels
 
#* Started taking data with AMO ~10:40pm
 
#* Started taking data with AMO ~10:40pm
 +
#** Cycled through the production sequence
 +
#** Collected ~800M Evts so far
 
# Issues and current Status
 
# Issues and current Status
 +
#* Minor DAQ crashes
 +
#* No beam for ~15min, 1L22-7 tripped
 +
#* Data taking runs smoothly right now
 
# Reports
 
# Reports
 +
#* Monitoring
 +
#* [https://logbooks.jlab.org/entry/3615131 Rates after accel. tests]
 
# Plans
 
# Plans
 +
#* Keep taking data over the weekend
 +
#* Any requests for additional tests/checks/measurements?
 
# AoB
 
# AoB
  

Revision as of 08:33, 26 October 2018

Friday, Oct 26 at 08:45

  1. Last 24h
    • Shifts were on standby until 8pm
    • Hall went into beam permit ~8:30pm
    • Filled target, performed harp scans, checked radiation levels
    • Started taking data with AMO ~10:40pm
      • Cycled through the production sequence
      • Collected ~800M Evts so far
  2. Issues and current Status
    • Minor DAQ crashes
    • No beam for ~15min, 1L22-7 tripped
    • Data taking runs smoothly right now
  3. Reports
  4. Plans
    • Keep taking data over the weekend
    • Any requests for additional tests/checks/measurements?
  5. AoB

Thursday, Oct 25 at 08:45

  1. Last 24h
  2. Issues and current Status
    • Hall is in controlled access
    • Accell.
      • Extended phaser studies/tests into swing-shift
      • Master Oscillator Modifications (MoMod) ~8h begin in swing-shift
    • Earliest to expect beam: Around owl-shift (i.e. Friday)
  3. Reports
  4. Plans
    • Today
      • Work in hall (stay in controlled access)
        • BCAL (Elton)
        • TOF (Beni)
        • Walk through(s)
      • Shifts are on standby until 11:59pm today
      • IF beam is back:
        • Fill target, perform harp scans, check radiation levels, PS-rates,...
        • Start data taking with AMO @ 180nA
    • Upcoming days
      • Take data as soon as beam is available
      • Accel.
        • Beam studies on Monday
        • RF recovery for Tuesday, need to re-tune one of the cavitis
  5. AoB