(Friday, Oct 26 at 08:45)
(Friday, Oct 26 at 08:45)
Line 17: Line 17:
 
#* Keep taking data over the weekend
 
#* Keep taking data over the weekend
 
#* Any requests for additional tests/checks/measurements?
 
#* Any requests for additional tests/checks/measurements?
 +
#* Accel.
 +
#** Beam studies on Monday
 +
#** RF recovery on Tuesday
 
# AoB
 
# AoB
 
#* Meeting during weekend?
 
#* Meeting during weekend?

Revision as of 08:38, 26 October 2018

Friday, Oct 26 at 08:45

  1. Last 24h
    • Shifts were on standby until 8pm
    • Hall went into beam permit ~8:30pm
    • Filled target, performed harp scans, checked radiation levels
    • Started taking data with AMO ~10:40pm
      • Cycled through the production sequence
      • Collected ~800M Evts so far
  2. Issues and current Status
    • Minor DAQ crashes
    • No beam for ~15min, 1L22-7 tripped
    • Data taking runs smoothly right now
  3. Reports
  4. Plans
    • Keep taking data over the weekend
    • Any requests for additional tests/checks/measurements?
    • Accel.
      • Beam studies on Monday
      • RF recovery on Tuesday
  5. AoB
    • Meeting during weekend?

Thursday, Oct 25 at 08:45

  1. Last 24h
  2. Issues and current Status
    • Hall is in controlled access
    • Accell.
      • Extended phaser studies/tests into swing-shift
      • Master Oscillator Modifications (MoMod) ~8h begin in swing-shift
    • Earliest to expect beam: Around owl-shift (i.e. Friday)
  3. Reports
  4. Plans
    • Today
      • Work in hall (stay in controlled access)
        • BCAL (Elton)
        • TOF (Beni)
        • Walk through(s)
      • Shifts are on standby until 11:59pm today
      • IF beam is back:
        • Fill target, perform harp scans, check radiation levels, PS-rates,...
        • Start data taking with AMO @ 180nA
    • Upcoming days
      • Take data as soon as beam is available
      • Accel.
        • Beam studies on Monday
        • RF recovery for Tuesday, need to re-tune one of the cavitis
  5. AoB