Difference between revisions of "Run Planning Meeting Notes, Oct 25-Oct 31, 2018"

From GlueXWiki
Jump to: navigation, search
(Tuesday, Oct 30 at 08:45)
Line 1: Line 1:
 
== Tuesday, Oct 30 at 08:45 ==
 
== Tuesday, Oct 30 at 08:45 ==
 
# Last 24h
 
# Last 24h
 +
#* Took data when beam was available
 +
#* Lost about ~5h beam
 +
#** [https://logbooks.jlab.org/entry/3617364 Hall B Spin dance: 5pm - 10pm]
 +
#** Accel. issues
 +
#* Beam has been taken away ~7am this morning
 
# Issues and current status
 
# Issues and current status
 +
#* Detector is on standby (empty target, coll. blocked,...)
 +
#* Accel. changed RF recovery to " General" recovery
 +
#* Hall D is in restricted access, Tagger hall will be soon
 
# Reports
 
# Reports
 
# Plans
 
# Plans
 
#* Accelerator
 
#* Accelerator
#** Take beam away ~7am and RadCon starts sweeping
+
#** Recovery
#** RF recovery after sweeping, should last until ~4pm
+
#** Hope beam to be back this afternoon
 
#* Hall D
 
#* Hall D
#** Shifts between 8am - 4pm are on standby
+
#** CompCal
#** Restricted access
+
#** Walk through
#*** CompCal
+
#** Any other work?
#*** Any other work?
+
#** Once beam is back
+
#*** Empty target run
+
 
# AoB
 
# AoB
  

Revision as of 08:27, 30 October 2018

Tuesday, Oct 30 at 08:45

  1. Last 24h
  2. Issues and current status
    • Detector is on standby (empty target, coll. blocked,...)
    • Accel. changed RF recovery to " General" recovery
    • Hall D is in restricted access, Tagger hall will be soon
  3. Reports
  4. Plans
    • Accelerator
      • Recovery
      • Hope beam to be back this afternoon
    • Hall D
      • CompCal
      • Walk through
      • Any other work?
  5. AoB

Monday, Oct 29 at 08:45

  1. Weekend: 10/26-10/28
  2. Issues and current Status
    • Main reasons for no data taking
      • Harp Scans ~30min
      • A few DAQ crashes
      • Beam down times ~30min (max. of 2h without beam)
    • BTA was partly not available
  3. Reports
  4. Plans
    • Accelerator
      • Mean studies on Monday (does not affect beam availability)
      • RF recovery on Tuesday
    • Hall D
      • Continue production runs until Tuesday morning
      • Tuesday
        • Go into restricted access on Tuesday for work at CompCal
        • Empty target run after RF recovery
  5. AoB
    • Open shift slots

Friday, Oct 26 at 08:45

  1. Last 24h
    • Shifts were on standby until 8pm
    • Hall went into beam permit ~8:30pm
    • Filled target, performed harp scans, checked radiation levels
    • Started taking data with AMO ~10:40pm
      • Cycled through the production sequence
      • Collected ~800M Evts so far
  2. Issues and current Status
    • Minor DAQ crashes
    • No beam for ~15min, 1L22-7 tripped
    • Data taking runs smoothly right now
  3. Reports
  4. Plans
    • Keep taking data over the weekend
    • No requests for additional tests/checks/measurements so far
    • Accel.
      • Beam studies on Monday
      • RF recovery on Tuesday
  5. AoB
    • No meeting during weekend

Thursday, Oct 25 at 08:45

  1. Last 24h
  2. Issues and current Status
    • Hall is in controlled access
    • Accell.
      • Extended phaser studies/tests into swing-shift
      • Master Oscillator Modifications (MoMod) ~8h begin in swing-shift
    • Earliest to expect beam: Around owl-shift (i.e. Friday)
  3. Reports
  4. Plans
    • Today
      • Work in hall (stay in controlled access)
        • BCAL (Elton)
        • TOF (Beni)
        • Walk through(s)
      • Shifts are on standby until 11:59pm today
      • IF beam is back:
        • Fill target, perform harp scans, check radiation levels, PS-rates,...
        • Start data taking with AMO @ 180nA
    • Upcoming days
      • Take data as soon as beam is available
      • Accel.
        • Beam studies on Monday
        • RF recovery for Tuesday, need to re-tune one of the cavitis
  5. AoB