== Friday, Oct 5 at 08:45 == | == Friday, Oct 5 at 08:45 == | ||
+ | # Notes from the previous 24 hours: | ||
+ | #CEBAF: | ||
+ | #Action Items: | ||
+ | #* Microscope occupancy is still unreliable - should be fixed when Richard has loaded new thresholds | ||
+ | #* Hodoscope module playing up | ||
+ | #Issues: | ||
+ | # Reports: | ||
+ | #*Monitoring | ||
+ | # Run Plan: | ||
+ | #* [https://halldweb.jlab.org/wiki/images/4/49/Fall18_week3.jpg Week 3] [https://halldweb.jlab.org/wiki/images/d/de/Fall18_week4.jpg Week 4] | ||
+ | #*Friday | ||
+ | #**TAC run | ||
+ | #***Hall C will be down from 7am for 6-8h | ||
+ | #***MCC need ~2h to set up low current, ETA 0830-0900, setup DAQ (~1h, Sasha), take data for 4-5h. (Go to 30nA & V-wire if we run out of Hall C downtime). | ||
+ | #*Weekend and longer term | ||
+ | #**Microscope threshold scan | ||
+ | #**High rate tests of L1 trigger and DAQ | ||
+ | #**Rate comparison test | ||
+ | #**RF Recovery on Tuesday, who needs an access? | ||
+ | #*[http://accboard.acc.jlab.org/ Acc whiteboard] | ||
+ | #*[https://halldweb.jlab.org/online/whiteboard/ Counting house whiteboard] | ||
+ | # AOB |
Revision as of 10:09, 4 October 2018
<- Back to Run Coordination Meetings:Fall2018 Run
- Trigger Spreadsheet Started Filling out on 9/28/18
- Run Plan Google Calendar
- Accel. Plan Google Calendar
Thursday, Oct 4 at 08:45
- Notes from the previous 24 hours:
- CEBAF:
- PSS trip in North Linac
- Hall C will ramp up to 60nA end of day shift/start of swing
- Action Items:
- Definition of nominal coherent peak energy
- Microscope occupancy is still unreliable - should be fixed when Richard has loaded new thresholds
- Hodoscope module playing up
- Discussion of rates
- Issues:
- Cigarette butts in the indoor trash - don't!
- Reports:
- Monitoring
- Run Plan:
- Week 2 Week 3 Week 4
- Thursday
- 0930 access
- TAC run preparation, Hovanes with ARM to install the Pb converter
- Parallel (rapid) access for Beni (CDC) and Tim (PS). Others?
- Radcon repair to radiation monitor to fix the alarm in counting room
- Hovanes will calibrate A.C. high gain setting (am, after access)
- 0930 access
- Friday
- TAC run
- Hall C will be down from 7am for 6-8h
- MCC need ~2h to set up low current, ETA 0830-0900, setup DAQ (~1h, Sasha), take data for 4-5h. (Go to 30nA & V-wire if we run out of Hall C downtime).
- TAC run
- Weekend and longer term
- High rate tests of L1 trigger and DAQ
- Rate comparison test
- RF Recovery on Tuesday, who needs an access?
- Acc whiteboard
- Counting house whiteboard
- AOB
Friday, Oct 5 at 08:45
- Notes from the previous 24 hours:
- CEBAF:
- Action Items:
- Microscope occupancy is still unreliable - should be fixed when Richard has loaded new thresholds
- Hodoscope module playing up
- Issues:
- Reports:
- Monitoring
- Run Plan:
- Week 3 Week 4
- Friday
- TAC run
- Hall C will be down from 7am for 6-8h
- MCC need ~2h to set up low current, ETA 0830-0900, setup DAQ (~1h, Sasha), take data for 4-5h. (Go to 30nA & V-wire if we run out of Hall C downtime).
- TAC run
- Weekend and longer term
- Microscope threshold scan
- High rate tests of L1 trigger and DAQ
- Rate comparison test
- RF Recovery on Tuesday, who needs an access?
- Acc whiteboard
- Counting house whiteboard
- AOB