Difference between revisions of "Run Planning Meeting Notes, Oct 4-Oct 10, 2018"
From GlueXWiki
Line 2: | Line 2: | ||
<!-- * [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2018-01/index.html Trigger graphs] Comment --> | <!-- * [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2018-01/index.html Trigger graphs] Comment --> | ||
− | * [https://docs.google.com/spreadsheets/d/1NffTc4-S5PbTMSuH_pp7ZYsGRH4JC_WSVo770_iJYt0/edit#gid=1865737386 Trigger Spreadsheet] | + | * [https://docs.google.com/spreadsheets/d/1NffTc4-S5PbTMSuH_pp7ZYsGRH4JC_WSVo770_iJYt0/edit#gid=1865737386 Trigger Spreadsheet] |
* [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&ctz=America%2FNew_York Run Plan Google Calendar] | * [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&ctz=America%2FNew_York Run Plan Google Calendar] | ||
* [https://calendar.google.com/calendar/embed?src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America%2FNew_York Accel. Plan Google Calendar] | * [https://calendar.google.com/calendar/embed?src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America%2FNew_York Accel. Plan Google Calendar] | ||
Line 65: | Line 65: | ||
#*[https://halldweb.jlab.org/online/whiteboard/ Counting house whiteboard] | #*[https://halldweb.jlab.org/online/whiteboard/ Counting house whiteboard] | ||
# AOB | # AOB | ||
+ | #*[https://docs.google.com/spreadsheets/d/1NffTc4-S5PbTMSuH_pp7ZYsGRH4JC_WSVo770_iJYt0/edit#gid=1865737386 Trigger Spreadsheet] |
Revision as of 10:10, 4 October 2018
<- Back to Run Coordination Meetings:Fall2018 Run
Thursday, Oct 4 at 08:45
- Notes from the previous 24 hours:
- CEBAF:
- PSS trip in North Linac
- Hall C will ramp up to 60nA end of day shift/start of swing
- Action Items:
- Definition of nominal coherent peak energy
- Microscope occupancy is still unreliable - should be fixed when Richard has loaded new thresholds
- Hodoscope module playing up
- Discussion of rates
- Issues:
- Cigarette butts in the indoor trash - don't!
- Reports:
- Monitoring
- Run Plan:
- Week 2 Week 3 Week 4
- Thursday
- 0930 access
- TAC run preparation, Hovanes with ARM to install the Pb converter
- Parallel (rapid) access for Beni (CDC) and Tim (PS). Others?
- Radcon repair to radiation monitor to fix the alarm in counting room
- Hovanes will calibrate A.C. high gain setting (am, after access)
- 0930 access
- Friday
- TAC run
- Hall C will be down from 7am for 6-8h
- MCC need ~2h to set up low current, ETA 0830-0900, setup DAQ (~1h, Sasha), take data for 4-5h. (Go to 30nA & V-wire if we run out of Hall C downtime).
- TAC run
- Weekend and longer term
- High rate tests of L1 trigger and DAQ
- Rate comparison test
- RF Recovery on Tuesday, who needs an access?
- Acc whiteboard
- Counting house whiteboard
- AOB
Friday, Oct 5 at 08:45
- Notes from the previous 24 hours:
- CEBAF:
- Action Items:
- Microscope occupancy is still unreliable - should be fixed when Richard has loaded new thresholds
- Hodoscope module playing up
- Issues:
- Reports:
- Monitoring
- Run Plan:
- Week 3 Week 4
- Friday
- TAC run
- Hall C will be down from 7am for 6-8h
- MCC need ~2h to set up low current, ETA 0830-0900, setup DAQ (~1h, Sasha), take data for 4-5h. (Go to 30nA & V-wire if we run out of Hall C downtime).
- TAC run
- Weekend and longer term
- Microscope threshold scan
- High rate tests of L1 trigger and DAQ
- Rate comparison test
- RF Recovery on Tuesday, who needs an access?
- Acc whiteboard
- Counting house whiteboard
- AOB