Difference between revisions of "Run Planning Meeting Notes, Oct 4-Oct 10, 2018"
From GlueXWiki
Line 6: | Line 6: | ||
* [https://calendar.google.com/calendar/embed?src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America%2FNew_York Accel. Plan Google Calendar] | * [https://calendar.google.com/calendar/embed?src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America%2FNew_York Accel. Plan Google Calendar] | ||
− | == | + | == Friday, Oct 5 at 08:45 == |
# Notes from the previous 24 hours: | # Notes from the previous 24 hours: | ||
− | |||
− | |||
#CEBAF: | #CEBAF: | ||
− | |||
− | |||
#Action Items: | #Action Items: | ||
− | |||
#* Microscope occupancy is still unreliable - should be fixed when Richard has loaded new thresholds | #* Microscope occupancy is still unreliable - should be fixed when Richard has loaded new thresholds | ||
#* Hodoscope module playing up | #* Hodoscope module playing up | ||
− | |||
#Issues: | #Issues: | ||
− | |||
# Reports: | # Reports: | ||
#*Monitoring | #*Monitoring | ||
# Run Plan: | # Run Plan: | ||
− | #* | + | #* [https://halldweb.jlab.org/wiki/images/4/49/Fall18_week3.jpg Week 3] [https://halldweb.jlab.org/wiki/images/d/de/Fall18_week4.jpg Week 4] |
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
#*Friday | #*Friday | ||
#**TAC run | #**TAC run | ||
Line 35: | Line 22: | ||
#***MCC need ~2h to set up low current, ETA 0830-0900, setup DAQ (~1h, Sasha), take data for 4-5h. (Go to 30nA & V-wire if we run out of Hall C downtime). | #***MCC need ~2h to set up low current, ETA 0830-0900, setup DAQ (~1h, Sasha), take data for 4-5h. (Go to 30nA & V-wire if we run out of Hall C downtime). | ||
#*Weekend and longer term | #*Weekend and longer term | ||
+ | #**Microscope threshold scan | ||
#**High rate tests of L1 trigger and DAQ | #**High rate tests of L1 trigger and DAQ | ||
#**Rate comparison test | #**Rate comparison test | ||
Line 41: | Line 29: | ||
#*[https://halldweb.jlab.org/online/whiteboard/ Counting house whiteboard] | #*[https://halldweb.jlab.org/online/whiteboard/ Counting house whiteboard] | ||
# AOB | # AOB | ||
+ | #*[https://docs.google.com/spreadsheets/d/1NffTc4-S5PbTMSuH_pp7ZYsGRH4JC_WSVo770_iJYt0/edit#gid=1865737386 Trigger Spreadsheet] | ||
− | == | + | == Thursday, Oct 4 at 08:45 == |
# Notes from the previous 24 hours: | # Notes from the previous 24 hours: | ||
+ | #* [https://logbooks.jlab.org/entry/3603333 Cryo target issue] | ||
+ | #* [https://logbooks.jlab.org/files/2018/10/3603312/rs_page09.png FCAL timing] | ||
#CEBAF: | #CEBAF: | ||
+ | #*PSS trip in North Linac | ||
+ | #*Hall C will ramp up to 60nA end of day shift/start of swing | ||
#Action Items: | #Action Items: | ||
+ | #* [https://logbooks.jlab.org/entry/3603555 Definition of nominal coherent peak energy] | ||
#* Microscope occupancy is still unreliable - should be fixed when Richard has loaded new thresholds | #* Microscope occupancy is still unreliable - should be fixed when Richard has loaded new thresholds | ||
#* Hodoscope module playing up | #* Hodoscope module playing up | ||
+ | #* [https://logbooks.jlab.org/entry/3603945 Discussion of rates] | ||
#Issues: | #Issues: | ||
+ | #*Cigarette butts in the indoor trash - don't! | ||
# Reports: | # Reports: | ||
#*Monitoring | #*Monitoring | ||
# Run Plan: | # Run Plan: | ||
− | #* [https://halldweb.jlab.org/wiki/images/4/49/Fall18_week3.jpg Week 3] [https://halldweb.jlab.org/wiki/images/d/de/Fall18_week4.jpg Week 4] | + | #* [https://halldweb.jlab.org/wiki/images/a/a7/Fall18_week2.jpg Week 2] [https://halldweb.jlab.org/wiki/images/4/49/Fall18_week3.jpg Week 3] [https://halldweb.jlab.org/wiki/images/d/de/Fall18_week4.jpg Week 4] |
+ | #*Thursday | ||
+ | #** 0930 access | ||
+ | #***TAC run preparation, Hovanes with ARM to install the Pb converter | ||
+ | #***Parallel (rapid) access for Beni (CDC) and Tim (PS). Others? | ||
+ | #***Radcon repair to radiation monitor to fix the alarm in counting room | ||
+ | #** Hovanes will calibrate A.C. high gain setting (am, after access) | ||
#*Friday | #*Friday | ||
#**TAC run | #**TAC run | ||
Line 58: | Line 60: | ||
#***MCC need ~2h to set up low current, ETA 0830-0900, setup DAQ (~1h, Sasha), take data for 4-5h. (Go to 30nA & V-wire if we run out of Hall C downtime). | #***MCC need ~2h to set up low current, ETA 0830-0900, setup DAQ (~1h, Sasha), take data for 4-5h. (Go to 30nA & V-wire if we run out of Hall C downtime). | ||
#*Weekend and longer term | #*Weekend and longer term | ||
− | |||
#**High rate tests of L1 trigger and DAQ | #**High rate tests of L1 trigger and DAQ | ||
#**Rate comparison test | #**Rate comparison test | ||
Line 65: | Line 66: | ||
#*[https://halldweb.jlab.org/online/whiteboard/ Counting house whiteboard] | #*[https://halldweb.jlab.org/online/whiteboard/ Counting house whiteboard] | ||
# AOB | # AOB | ||
− |
Revision as of 10:21, 4 October 2018
<- Back to Run Coordination Meetings:Fall2018 Run
Friday, Oct 5 at 08:45
- Notes from the previous 24 hours:
- CEBAF:
- Action Items:
- Microscope occupancy is still unreliable - should be fixed when Richard has loaded new thresholds
- Hodoscope module playing up
- Issues:
- Reports:
- Monitoring
- Run Plan:
- Week 3 Week 4
- Friday
- TAC run
- Hall C will be down from 7am for 6-8h
- MCC need ~2h to set up low current, ETA 0830-0900, setup DAQ (~1h, Sasha), take data for 4-5h. (Go to 30nA & V-wire if we run out of Hall C downtime).
- TAC run
- Weekend and longer term
- Microscope threshold scan
- High rate tests of L1 trigger and DAQ
- Rate comparison test
- RF Recovery on Tuesday, who needs an access?
- Acc whiteboard
- Counting house whiteboard
- AOB
Thursday, Oct 4 at 08:45
- Notes from the previous 24 hours:
- CEBAF:
- PSS trip in North Linac
- Hall C will ramp up to 60nA end of day shift/start of swing
- Action Items:
- Definition of nominal coherent peak energy
- Microscope occupancy is still unreliable - should be fixed when Richard has loaded new thresholds
- Hodoscope module playing up
- Discussion of rates
- Issues:
- Cigarette butts in the indoor trash - don't!
- Reports:
- Monitoring
- Run Plan:
- Week 2 Week 3 Week 4
- Thursday
- 0930 access
- TAC run preparation, Hovanes with ARM to install the Pb converter
- Parallel (rapid) access for Beni (CDC) and Tim (PS). Others?
- Radcon repair to radiation monitor to fix the alarm in counting room
- Hovanes will calibrate A.C. high gain setting (am, after access)
- 0930 access
- Friday
- TAC run
- Hall C will be down from 7am for 6-8h
- MCC need ~2h to set up low current, ETA 0830-0900, setup DAQ (~1h, Sasha), take data for 4-5h. (Go to 30nA & V-wire if we run out of Hall C downtime).
- TAC run
- Weekend and longer term
- High rate tests of L1 trigger and DAQ
- Rate comparison test
- RF Recovery on Tuesday, who needs an access?
- Acc whiteboard
- Counting house whiteboard
- AOB