(Thursday, October 14)
Line 5: Line 5:
 
#* Swing summary: https://logbooks.jlab.org/entry/3923728
 
#* Swing summary: https://logbooks.jlab.org/entry/3923728
 
#* Day summary: https://logbooks.jlab.org/entry/3923480  
 
#* Day summary: https://logbooks.jlab.org/entry/3923480  
#* ~1B triggers with B-field LHe 200nA.
+
#* 374M(day+swing) triggers with B-field LHe 200nA.
 +
#* short downtime (~30 min) HallA BLA calibration
 
#* Run 81504 in raw mode
 
#* Run 81504 in raw mode
 
#* Run 81505 ~40min no D laser, B,C up, A down, last minute with the D laser.  
 
#* Run 81505 ~40min no D laser, B,C up, A down, last minute with the D laser.  
 
# Issues:
 
# Issues:
 +
#* spike in beam current https://logbooks.jlab.org/entry/3923798
 
#* noisy FDC wires https://logbooks.jlab.org/entry/3923747
 
#* noisy FDC wires https://logbooks.jlab.org/entry/3923747
 
#* Bleedthrough
 
#* Bleedthrough
 
# [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2021.pdf Plan:]
 
# [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2021.pdf Plan:]
 
#* 2 more shits with 200 nA and target filled with He then wait for decision from Primex 4 pm meeting.
 
#* 2 more shits with 200 nA and target filled with He then wait for decision from Primex 4 pm meeting.

Revision as of 22:24, 13 October 2021

Thursday, October 14

  1. In last 24 hours:
  2. Issues:
  3. Plan:
    • 2 more shits with 200 nA and target filled with He then wait for decision from Primex 4 pm meeting.