Difference between revisions of "Run Planning Meeting Notes, October 14 - October 20, 2021"

From GlueXWiki
Jump to: navigation, search
(Friday, October 15)
(Friday, October 15)
Line 22: Line 22:
 
=Friday, October 15=
 
=Friday, October 15=
 
# In last 24 hours:
 
# In last 24 hours:
#* power of infiniband switch tripped (one strip cord)- causing 4h UED -https://logbooks.jlab.org/entry/3924903 https://logbooks.jlab.org/entry/3925176 https://logbooks.jlab.org/entry/3925185
+
#* power of infiniband switch tripped (one strip cord)- causing 4h UED -https://logbooks.jlab.org/entry/3924903 https://logbooks.jlab.org/entry/3925176  
 +
#** group disk not mounted https://logbooks.jlab.org/entry/3925185
 +
#** trigger rate not archived https://logbooks.jlab.org/entry/3925225
 
#* FDC chiller replaced https://logbooks.jlab.org/entry/3924510
 
#* FDC chiller replaced https://logbooks.jlab.org/entry/3924510
 
#* beacon bulb replaced - took 2h
 
#* beacon bulb replaced - took 2h

Revision as of 08:27, 15 October 2021

Thursday, October 14

  1. In last 24 hours:
  2. Remaining issues:
  3. Plan:
    • 2 more shifts with 200 nA and target filled with He then wait for decision from Primex 4 pm meeting.

Friday, October 15

  1. In last 24 hours:
  2. Remaining issues:
    • fix remaining problems on gluon machines
    • Bleedthrough
  3. Plan:
    • run till 5pm with full target, then with empty over the weekend - inform target group (Chris) when emptying/filling the target