(Monday, October 18)
(Monday, October 18)
Line 7: Line 7:
 
#* TAGM TDC calibration problem - https://logbooks.jlab.org/entry/3926306 solved after several runs  
 
#* TAGM TDC calibration problem - https://logbooks.jlab.org/entry/3926306 solved after several runs  
 
#* NMR probe stop scanning https://logbooks.jlab.org/entry/3926647 https://logbooks.jlab.org/entry/3926650
 
#* NMR probe stop scanning https://logbooks.jlab.org/entry/3926647 https://logbooks.jlab.org/entry/3926650
 +
#* last bleedthrough run taken with low pulser rate https://logbooks.jlab.org/entry/3925916
 
#* archiving trigger rate - solved by David https://logbooks.jlab.org/entry/3925225
 
#* archiving trigger rate - solved by David https://logbooks.jlab.org/entry/3925225
 
# Remaining issues:
 
# Remaining issues:

Revision as of 10:52, 17 October 2021

Monday, October 18

  1. Over the weekend:
  2. Remaining issues:
    • tagger NMR not scanning
    • Bleedthrough
  3. Plan:
    • 8am pass change - start filling the target - inform target group (Chris)
    • install the FDC chiller power switch
    • plan for day/swing on Wednesday - maintenance

Friday, October 15

  1. In last 24 hours:
  2. Remaining issues:
  3. Plan:
    • run till 5pm with full target, then with empty over the weekend - inform target group (Chris) when emptying/filling the target
    • pass change on Monday
    • day/swing on Wednesday - maintenance


Thursday, October 14

  1. In last 24 hours:
  2. Remaining issues:
  3. Plan:
    • 2 more shifts with 200 nA and target filled with He then wait for decision from Primex 4 pm meeting.