Difference between revisions of "Run Planning Meeting Notes, October 14 - October 20, 2021"

From GlueXWiki
Jump to: navigation, search
(Tuesday, October 19)
(Tuesday, October 19)
Line 3: Line 3:
 
#* Target filled 9am-12pm - https://logbooks.jlab.org/entry/3927473
 
#* Target filled 9am-12pm - https://logbooks.jlab.org/entry/3927473
 
#* harp scan results https://logbooks.jlab.org/entry/3927666
 
#* harp scan results https://logbooks.jlab.org/entry/3927666
#* 3pm-9:30pm  very productive:  XXXM events on full target
+
#* 3pm-9:30pm  very productive
#* 9pm-XX - beam down retuning cavities
+
#* starting 9:30pm bumpy night - beam down re-tuning cavities, tuning Hall A, Hall B bleedthrough
 +
#* ~300M events on full target
 
#* Work on FCAL - https://logbooks.jlab.org/entry/3927498  
 
#* Work on FCAL - https://logbooks.jlab.org/entry/3927498  
 
#* power switch on FDC chiller re-installed - https://logbooks.jlab.org/entry/3927527
 
#* power switch on FDC chiller re-installed - https://logbooks.jlab.org/entry/3927527
#* BCAL 10 o'clock moise might be related to left arm shielding - https://logbooks.jlab.org/entry/3927768
+
#* BCAL 10 o'clock noise might be related to left arm shielding - https://logbooks.jlab.org/entry/3927768
 +
#* FDC efficiency - https://logbooks.jlab.org/entry/3927560
 
# Remaining issues:
 
# Remaining issues:
 
#* tagger NMR not scanning (communication with accel. w.r.t. tagger magnet)
 
#* tagger NMR not scanning (communication with accel. w.r.t. tagger magnet)
 
#* BCAL noise at 10 o'clock
 
#* BCAL noise at 10 o'clock
 +
#* improve communications with the accel. w.r.t. the tagger magnet
 
#* Bleedthrough
 
#* Bleedthrough
 
# [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2021.pdf Plan:]
 
# [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2021.pdf Plan:]
#* plan for day/swing on Wednesday - maintenance
+
#* plan for day/swing on Wednesday - maintenance  
#** position survey CCAL - requires RadCon survey prior?
+
#** position survey CCAL - DOESN'T require RadCon survey  
 
#** correct shielding  at the left (downstream) PS arm
 
#** correct shielding  at the left (downstream) PS arm
 
#** do measurements with magnetometer
 
#** do measurements with magnetometer

Revision as of 08:37, 19 October 2021

Tuesday, October 19

  1. Last 24:
  2. Remaining issues:
    • tagger NMR not scanning (communication with accel. w.r.t. tagger magnet)
    • BCAL noise at 10 o'clock
    • improve communications with the accel. w.r.t. the tagger magnet
    • Bleedthrough
  3. Plan:
    • plan for day/swing on Wednesday - maintenance
      • position survey CCAL - DOESN'T require RadCon survey
      • correct shielding at the left (downstream) PS arm
      • do measurements with magnetometer
      • ...

Monday, October 18

  1. Over the weekend:
  2. Remaining issues:
    • tagger NMR not scanning
    • BCAL noise at 10 o'clock
    • Bleedthrough
  3. Plan:
    • 9am pass change - start filling the target
    • plan for day/swing on Wednesday - maintenance
      • position survey CCAL - requires RadCon survey prior
      • install additional shielding at the left (downstream) PS arm
      • do measurements with magnetometer
      • ...

Friday, October 15

  1. In last 24 hours:
  2. Remaining issues:
  3. Plan:
    • run till 5pm with full target, then with empty over the weekend - inform target group (Chris) when emptying/filling the target
    • pass change on Monday
    • day/swing on Wednesday - maintenance


Thursday, October 14

  1. In last 24 hours:
  2. Remaining issues:
  3. Plan:
    • 2 more shifts with 200 nA and target filled with He then wait for decision from Primex 4 pm meeting.