Difference between revisions of "Run Planning Meeting Notes, October 14 - October 20, 2021"

From GlueXWiki
Jump to: navigation, search
Line 19: Line 19:
 
# [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2021.pdf Plan:]
 
# [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2021.pdf Plan:]
 
#* 2 more shifts with 200 nA and target filled with He then wait for decision from Primex 4 pm meeting.
 
#* 2 more shifts with 200 nA and target filled with He then wait for decision from Primex 4 pm meeting.
 +
 +
=Friday, October 15=
 +
# In last 24 hours:
 +
#* power of infiniband switch tripped (one strip cord)- causing 4h UED -https://logbooks.jlab.org/entry/3924903 https://logbooks.jlab.org/entry/3925176 https://logbooks.jlab.org/entry/3925185
 +
#* FDC chiller replaced https://logbooks.jlab.org/entry/3924510
 +
#* beacon bulb replaced - took 2h
 +
#* FDC hot wires https://logbooks.jlab.org/entry/3924538 - no more noise
 +
#*
 +
#* 6h downtime - NL cold box + other things
 +
#* more rootspy nodes https://logbooks.jlab.org/entry/3924610 (David)
 +
# Remaining issues:
 +
#* fix remaining problems on gluon machines
 +
#* Bleedthrough
 +
# [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2021.pdf Plan:]
 +
#* run till 5pm with full target, then with empty over the weekend

Revision as of 07:31, 15 October 2021

Thursday, October 14

  1. In last 24 hours:
  2. Remaining issues:
  3. Plan:
    • 2 more shifts with 200 nA and target filled with He then wait for decision from Primex 4 pm meeting.

Friday, October 15

  1. In last 24 hours:
  2. Remaining issues:
    • fix remaining problems on gluon machines
    • Bleedthrough
  3. Plan:
    • run till 5pm with full target, then with empty over the weekend