Difference between revisions of "Run Planning Meeting Notes, October 14 - October 20, 2021"

From GlueXWiki
Jump to: navigation, search
(Friday, October 15)
(Friday, October 15)
Line 27: Line 27:
 
#* FDC chiller replaced https://logbooks.jlab.org/entry/3924510
 
#* FDC chiller replaced https://logbooks.jlab.org/entry/3924510
 
#* beacon bulb replaced - took 2h
 
#* beacon bulb replaced - took 2h
#* FDC hot wires https://logbooks.jlab.org/entry/3924538 - no more noise
+
#* FDC hot wires https://logbooks.jlab.org/entry/3924538 - no more noise but higher discr. thresholds
 
#* 6h downtime - NL cold box + other things
 
#* 6h downtime - NL cold box + other things
 
#* harp scans - https://logbooks.jlab.org/entry/3924829  https://logbooks.jlab.org/entry/3924830  https://logbooks.jlab.org/entry/3924845 https://logbooks.jlab.org/entry/3924851
 
#* harp scans - https://logbooks.jlab.org/entry/3924829  https://logbooks.jlab.org/entry/3924830  https://logbooks.jlab.org/entry/3924845 https://logbooks.jlab.org/entry/3924851

Revision as of 08:28, 15 October 2021

Thursday, October 14

  1. In last 24 hours:
  2. Remaining issues:
  3. Plan:
    • 2 more shifts with 200 nA and target filled with He then wait for decision from Primex 4 pm meeting.

Friday, October 15

  1. In last 24 hours:
  2. Remaining issues:
    • fix remaining problems on gluon machines
    • Bleedthrough
  3. Plan:
    • run till 5pm with full target, then with empty over the weekend - inform target group (Chris) when emptying/filling the target