Difference between revisions of "Run Planning Meeting Notes, October 14 - October 20, 2021"

From GlueXWiki
Jump to: navigation, search
(Friday, October 15)
(Friday, October 15)
Line 27: Line 27:
 
#* FDC chiller replaced https://logbooks.jlab.org/entry/3924510
 
#* FDC chiller replaced https://logbooks.jlab.org/entry/3924510
 
#* beacon bulb replaced - took 2h
 
#* beacon bulb replaced - took 2h
#* FDC hot wires https://logbooks.jlab.org/entry/3924538 - no more noise but higher discr. thresholds
+
#* FDC hot wires https://logbooks.jlab.org/entry/3924538 - no more noise but higher discr. thresholds (need 30 min to optimize the thresholds)
 
#* 6h downtime - NL cold box + other things
 
#* 6h downtime - NL cold box + other things
 
#* harp scans - https://logbooks.jlab.org/entry/3924829  https://logbooks.jlab.org/entry/3924830  https://logbooks.jlab.org/entry/3924845 https://logbooks.jlab.org/entry/3924851
 
#* harp scans - https://logbooks.jlab.org/entry/3924829  https://logbooks.jlab.org/entry/3924830  https://logbooks.jlab.org/entry/3924845 https://logbooks.jlab.org/entry/3924851
Line 38: Line 38:
 
# [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2021.pdf Plan:]
 
# [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2021.pdf Plan:]
 
#* run till 5pm with full target, then with empty over the weekend - inform target group (Chris) when emptying/filling the target
 
#* run till 5pm with full target, then with empty over the weekend - inform target group (Chris) when emptying/filling the target
 +
#* pass change on Monday
 +
#* day/swing on Wednesday - maintenance

Revision as of 08:31, 15 October 2021

Thursday, October 14

  1. In last 24 hours:
  2. Remaining issues:
  3. Plan:
    • 2 more shifts with 200 nA and target filled with He then wait for decision from Primex 4 pm meeting.

Friday, October 15

  1. In last 24 hours:
  2. Remaining issues:
    • fix remaining problems on gluon machines
    • Bleedthrough
  3. Plan:
    • run till 5pm with full target, then with empty over the weekend - inform target group (Chris) when emptying/filling the target
    • pass change on Monday
    • day/swing on Wednesday - maintenance