=Tuesday, October 19=
 +
# Last 24:
 +
#* Target filled 9am-12pm - https://logbooks.jlab.org/entry/3927473
 +
#* 3pm-9:30pm  very productive:  XXXM events on full target
 +
#* Work on FCAL - https://logbooks.jlab.org/entry/3927498
 +
#* 9pm-XX - beam down retuning cavities
 +
#* power switch on FDC chiller re-installed - https://logbooks.jlab.org/entry/3927527
 +
#* BCAL 10 o'clock moise might be related to left arm shielding - https://logbooks.jlab.org/entry/3927768
 +
# Remaining issues:
 +
#* tagger NMR not scanning (communication with accel. w.r.t. tagger magnet)
 +
#* BCAL noise at 10 o'clock
 +
#* Bleedthrough
 +
# [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2021.pdf Plan:]
 +
#* plan for day/swing on Wednesday - maintenance
 +
#** position survey CCAL - requires RadCon survey prior?
 +
#** correct shielding  at the left (downstream) PS arm
 +
#** do measurements with magnetometer
 +
#** ...
 +
 +
 
=Monday, October 18=
 
=Monday, October 18=
 
# Over the weekend:
 
# Over the weekend:

Revision as of 23:47, 18 October 2021

Tuesday, October 19

  1. Last 24:
  2. Remaining issues:
    • tagger NMR not scanning (communication with accel. w.r.t. tagger magnet)
    • BCAL noise at 10 o'clock
    • Bleedthrough
  3. Plan:
    • plan for day/swing on Wednesday - maintenance
      • position survey CCAL - requires RadCon survey prior?
      • correct shielding at the left (downstream) PS arm
      • do measurements with magnetometer
      • ...


Monday, October 18

  1. Over the weekend:
  2. Remaining issues:
    • tagger NMR not scanning
    • BCAL noise at 10 o'clock
    • Bleedthrough
  3. Plan:
    • 9am pass change - start filling the target
    • plan for day/swing on Wednesday - maintenance
      • position survey CCAL - requires RadCon survey prior
      • install additional shielding at the left (downstream) PS arm
      • do measurements with magnetometer
      • ...

Friday, October 15

  1. In last 24 hours:
  2. Remaining issues:
  3. Plan:
    • run till 5pm with full target, then with empty over the weekend - inform target group (Chris) when emptying/filling the target
    • pass change on Monday
    • day/swing on Wednesday - maintenance


Thursday, October 14

  1. In last 24 hours:
  2. Remaining issues:
  3. Plan:
    • 2 more shifts with 200 nA and target filled with He then wait for decision from Primex 4 pm meeting.