(Monday, October 18)
(Tuesday, October 19)
Line 3: Line 3:
 
#* Target filled 9am-12pm - https://logbooks.jlab.org/entry/3927473
 
#* Target filled 9am-12pm - https://logbooks.jlab.org/entry/3927473
 
#* 3pm-9:30pm  very productive:  XXXM events on full target
 
#* 3pm-9:30pm  very productive:  XXXM events on full target
#* Work on FCAL - https://logbooks.jlab.org/entry/3927498
 
 
#* 9pm-XX - beam down retuning cavities
 
#* 9pm-XX - beam down retuning cavities
 +
#* Work on FCAL - https://logbooks.jlab.org/entry/3927498
 
#* power switch on FDC chiller re-installed - https://logbooks.jlab.org/entry/3927527
 
#* power switch on FDC chiller re-installed - https://logbooks.jlab.org/entry/3927527
 
#* BCAL 10 o'clock moise might be related to left arm shielding - https://logbooks.jlab.org/entry/3927768
 
#* BCAL 10 o'clock moise might be related to left arm shielding - https://logbooks.jlab.org/entry/3927768
Line 17: Line 17:
 
#** do measurements with magnetometer
 
#** do measurements with magnetometer
 
#** ...
 
#** ...
 
  
 
=Monday, October 18=
 
=Monday, October 18=

Revision as of 23:49, 18 October 2021

Tuesday, October 19

  1. Last 24:
  2. Remaining issues:
    • tagger NMR not scanning (communication with accel. w.r.t. tagger magnet)
    • BCAL noise at 10 o'clock
    • Bleedthrough
  3. Plan:
    • plan for day/swing on Wednesday - maintenance
      • position survey CCAL - requires RadCon survey prior?
      • correct shielding at the left (downstream) PS arm
      • do measurements with magnetometer
      • ...

Monday, October 18

  1. Over the weekend:
  2. Remaining issues:
    • tagger NMR not scanning
    • BCAL noise at 10 o'clock
    • Bleedthrough
  3. Plan:
    • 9am pass change - start filling the target
    • plan for day/swing on Wednesday - maintenance
      • position survey CCAL - requires RadCon survey prior
      • install additional shielding at the left (downstream) PS arm
      • do measurements with magnetometer
      • ...

Friday, October 15

  1. In last 24 hours:
  2. Remaining issues:
  3. Plan:
    • run till 5pm with full target, then with empty over the weekend - inform target group (Chris) when emptying/filling the target
    • pass change on Monday
    • day/swing on Wednesday - maintenance


Thursday, October 14

  1. In last 24 hours:
  2. Remaining issues:
  3. Plan:
    • 2 more shifts with 200 nA and target filled with He then wait for decision from Primex 4 pm meeting.