=Wednesday, October 20=
 +
# Last 24:
 +
#* taking data till 5:20pm
 +
#* At 5:20pm SL dropped due to LCW/power problem; NL shut down to prevent tripping; tagger magnet ramp down https://logbooks.jlab.org/entry/3928353
 +
#* tagger magnet restored - https://logbooks.jlab.org/entry/3928399
 +
#* empty target reconstructed - https://logbooks.jlab.org/entry/3928026
 +
#* timing calibration https://logbooks.jlab.org/entry/3928409
 +
# Remaining issues:
 +
#* tagger NMR not scanning (communication with accel. w.r.t. tagger magnet)
 +
#* BCAL noise at 10 o'clock
 +
#* Bleedthrough
 +
# [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2021.pdf Plan:]
 +
#* plan for day/swing on Wednesday - maintenance
 +
#** position survey CCAL - DOESN'T require RadCon survey
 +
#** correct shielding  at the left (downstream) PS arm
 +
#** do measurements with magnetometer
 +
#** FCAL work
 +
#** troubleshoot the faulty FDC chiller
 +
#* when to beam is back continue production at 200nA
 +
 
=Tuesday, October 19=
 
=Tuesday, October 19=
 
# Last 24:
 
# Last 24:

Revision as of 23:30, 19 October 2021

Wednesday, October 20

  1. Last 24:
  2. Remaining issues:
    • tagger NMR not scanning (communication with accel. w.r.t. tagger magnet)
    • BCAL noise at 10 o'clock
    • Bleedthrough
  3. Plan:
    • plan for day/swing on Wednesday - maintenance
      • position survey CCAL - DOESN'T require RadCon survey
      • correct shielding at the left (downstream) PS arm
      • do measurements with magnetometer
      • FCAL work
      • troubleshoot the faulty FDC chiller
    • when to beam is back continue production at 200nA

Tuesday, October 19

  1. Last 24:
  2. Remaining issues:
    • tagger NMR not scanning (communication with accel. w.r.t. tagger magnet)
    • BCAL noise at 10 o'clock
    • improve communications with the accel. w.r.t. the tagger magnet
    • Bleedthrough
  3. Plan:
    • production 200nA
    • plan for day/swing on Wednesday - maintenance
      • position survey CCAL - DOESN'T require RadCon survey
      • correct shielding at the left (downstream) PS arm
      • do measurements with magnetometer
      • ...

Monday, October 18

  1. Over the weekend:
  2. Remaining issues:
    • tagger NMR not scanning
    • BCAL noise at 10 o'clock
    • Bleedthrough
  3. Plan:
    • 9am pass change - start filling the target
    • plan for day/swing on Wednesday - maintenance
      • position survey CCAL - requires RadCon survey prior
      • install additional shielding at the left (downstream) PS arm
      • do measurements with magnetometer
      • ...

Friday, October 15

  1. In last 24 hours:
  2. Remaining issues:
  3. Plan:
    • run till 5pm with full target, then with empty over the weekend - inform target group (Chris) when emptying/filling the target
    • pass change on Monday
    • day/swing on Wednesday - maintenance


Thursday, October 14

  1. In last 24 hours:
  2. Remaining issues:
  3. Plan:
    • 2 more shifts with 200 nA and target filled with He then wait for decision from Primex 4 pm meeting.