(Thursday, October 21)
(Thursday, October 21)
Line 1: Line 1:
 
=Thursday, October 21=
 
=Thursday, October 21=
 
# Last 24h:
 
# Last 24h:
#* No beam from 5:20pm Tuesday until ??? due to LCW/power problem
+
#* No beam from 5:20pm Tuesday until 2am Thurs due to LCW/power problem
 
#* Work done during the access:
 
#* Work done during the access:
#** position survey CCAL - DOESN'T require RadCon survey
 
#** correct shielding  at the left (downstream) PS arm
 
 
#** [https://logbooks.jlab.org/entry/3928644 magnetic field measurements around CCAL]
 
#** [https://logbooks.jlab.org/entry/3928644 magnetic field measurements around CCAL]
 
#** [https://logbooks.jlab.org/entry/3928669 15 FCAL bases replaced] and [https://logbooks.jlab.org/entry/3928811 re-terminated one cable]
 
#** [https://logbooks.jlab.org/entry/3928669 15 FCAL bases replaced] and [https://logbooks.jlab.org/entry/3928811 re-terminated one cable]
 
#** [https://logbooks.jlab.org/entry/3928624 faulty FDC chiller replaced]
 
#** [https://logbooks.jlab.org/entry/3928624 faulty FDC chiller replaced]
 
#** [https://logbooks.jlab.org/entry/3928742 rebalanced the server power load on rack 13]
 
#** [https://logbooks.jlab.org/entry/3928742 rebalanced the server power load on rack 13]
 +
#** ? position survey CCAL ?
 +
#** ? correct shielding  at the left (downstream) PS arm ?
 
# Remaining issues:
 
# Remaining issues:
 
#* [https://logbooks.jlab.org/entry/3929404 Tagger hodoscope time shifts]
 
#* [https://logbooks.jlab.org/entry/3929404 Tagger hodoscope time shifts]

Revision as of 07:29, 21 October 2021

Thursday, October 21

  1. Last 24h:
  2. Remaining issues:
    • Tagger hodoscope time shifts
    • communication with accel. w.r.t. tagger magnet - Paul Vasilauskis (Ops group leader): "I am putting out to my staff to contact the hall if they do need to touch the magnet and am looking into adding wording to the magnet screens"
    • BCAL noise at 10 o'clock
    • Bleedthrough
  3. Plan:
    • When the beam is back continue production at 200nA after the usual checks (radiation levels & harp scans)
    • Continue running with the solenoid on & target full until Friday or later
    • Pass change possible Friday or Saturday
    • Expect some downtime Monday daytime for VIP tour