Difference between revisions of "Run Planning Meeting Notes, October 21 - October 27, 2021"

From GlueXWiki
Jump to: navigation, search
(Thursday, October 21)
(Thursday, October 21)
Line 19: Line 19:
 
#* When the beam is back continue production at 200nA after the usual checks (radiation levels & harp scans)
 
#* When the beam is back continue production at 200nA after the usual checks (radiation levels & harp scans)
 
#* Continue running with the solenoid on & target full until Friday or later
 
#* Continue running with the solenoid on & target full until Friday or later
#* Pass change for A&B possible Friday or Saturday
+
#* [https://cebaf.jlab.org/files/ops/accboard/ Pass change for A&B possible Friday or Saturday]
 
#* Expect some downtime Monday daytime for VIP tour
 
#* Expect some downtime Monday daytime for VIP tour

Revision as of 07:48, 21 October 2021

<-- Summer 2021 RC meetings

Thursday, October 21

  1. Last 24h:
  2. Remaining issues:
    • Tagger hodoscope time shifts
    • communication with accel. w.r.t. tagger magnet - Paul Vasilauskis (Ops group leader): "I am putting out to my staff to contact the hall if they do need to touch the magnet and am looking into adding wording to the magnet screens"
    • BCAL noise at 10 o'clock
    • Bleedthrough
  3. Plan:
    • When the beam is back continue production at 200nA after the usual checks (radiation levels & harp scans)
    • Continue running with the solenoid on & target full until Friday or later
    • Pass change for A&B possible Friday or Saturday
    • Expect some downtime Monday daytime for VIP tour