Difference between revisions of "Run Planning Meeting Notes, October 21 - October 27, 2021"

From GlueXWiki
Jump to: navigation, search
(Thursday, October 21)
(Thursday, October 21)
Line 10: Line 10:
 
#** [https://logbooks.jlab.org/entry/3928624 faulty FDC chiller replaced]
 
#** [https://logbooks.jlab.org/entry/3928624 faulty FDC chiller replaced]
 
#** [https://logbooks.jlab.org/entry/3928742 rebalanced the server power load on rack 13]
 
#** [https://logbooks.jlab.org/entry/3928742 rebalanced the server power load on rack 13]
#** ? position survey CCAL ?
+
#** position survey CCAL
#** ? correct shielding at the left (downstream) PS arm ?
+
#** correct shielding at the left (downstream) PS arm
 
# Remaining issues:
 
# Remaining issues:
 
#* [https://logbooks.jlab.org/entry/3929404 Tagger hodoscope time shifts]
 
#* [https://logbooks.jlab.org/entry/3929404 Tagger hodoscope time shifts]

Revision as of 09:04, 21 October 2021

<-- Summer 2021 RC meetings

Thursday, October 21

  1. Last 24h:
  2. Remaining issues:
    • Tagger hodoscope time shifts
    • communication with accel. w.r.t. tagger magnet - Paul Vasilauskis (Ops group leader): "I am putting out to my staff to contact the hall if they do need to touch the magnet and am looking into adding wording to the magnet screens"
    • BCAL noise at 10 o'clock
    • Bleedthrough
  3. Plan:
    • When the beam is back continue production at 200nA after the usual checks (radiation levels & harp scans)
    • Continue running with the solenoid on & target full until Friday or later
    • Pass change for A&B Saturday morning (A->4 pass)
    • Expect downtime Monday morning for VIP tour, start time TBC probably ~7am.
    • Ops will need another maintenance day before the energy change