=== Past 24 hours ===
 
=== Past 24 hours ===
*  
+
* Smooth running with empty target
* CDC Pressure alarms
+
* 6 CDC Pressure alarms: new run started each time, last one required DAQ crate reboot (delayed restart)
  
 
=== Shift Summary ===
 
=== Shift Summary ===
Line 22: Line 22:
  
 
=== Issues/Reports ===
 
=== Issues/Reports ===
* [https://logbooks.jlab.org/entry/4069731 32 ns shift in tagger crate]
+
* [https://logbooks.jlab.org/comment/41666#comment-41666 Avoid long prestarts]
 +
* [https://logbooks.jlab.org/entry/4069731 32 ns shift in tagger crate] (no action required)
 
* [https://logbooks.jlab.org/entry/4070799 SC Dark Current/Rates] (Beni)
 
* [https://logbooks.jlab.org/entry/4070799 SC Dark Current/Rates] (Beni)
 
* Do we still want beam strip charts in the logbook every 2 hours (as noted on white board)?
 
* Do we still want beam strip charts in the logbook every 2 hours (as noted on white board)?
  
 
=== Plan ===
 
=== Plan ===
* RF recovery for 4 hours this morning, starting at 8 am: target testing, then fill target before beam returns
+
* RF recovery for 4 hours this morning, starting at 8 am: target testing, then  
 
** Expect to start beam recovery around noon
 
** Expect to start beam recovery around noon
 +
** Fill target before beam returns for production data
 
* Harp scan after beam is restored(?), more than a week since the last one (Alexandre)
 
* Harp scan after beam is restored(?), more than a week since the last one (Alexandre)

Revision as of 08:40, 27 October 2022

Meetings are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)

MCC whiteboard

Hall D counting room white board

Hall D Logbook

Back to Run Coordination Meetings:Fall2022

Thursday, October 27

Past 24 hours

  • Smooth running with empty target
  • 6 CDC Pressure alarms: new run started each time, last one required DAQ crate reboot (delayed restart)

Shift Summary

Issues/Reports

Plan

  • RF recovery for 4 hours this morning, starting at 8 am: target testing, then
    • Expect to start beam recovery around noon
    • Fill target before beam returns for production data
  • Harp scan after beam is restored(?), more than a week since the last one (Alexandre)