=Thursday, October 27=
 +
=== Past 24 hours ===
 +
 +
=== Shift Summary ===
 +
 +
=== Issues/Reports ===
 +
 +
=== Plan ===
 +
* Production data with full target
  
 
=Thursday, October 27=
 
=Thursday, October 27=
Line 31: Line 41:
 
** Expect to start beam recovery around noon
 
** Expect to start beam recovery around noon
 
** Fill target before beam returns for production data
 
** Fill target before beam returns for production data
* Harp scan after beam is restored(?), more than a week since the last one (Alexandre)
+
* Harp scan after beam is restored, more than a week since the last one (Alexandre)
 +
* Check calibration of CompCal modules with adjusted HV, 1 hr at low intensity (Sasha)
 +
* Production data with full target

Revision as of 09:05, 27 October 2022

Meetings are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)

MCC whiteboard

Hall D counting room white board

Hall D Logbook

Back to Run Coordination Meetings:Fall2022

Thursday, October 27

Past 24 hours

Shift Summary

Issues/Reports

Plan

  • Production data with full target

Thursday, October 27

Past 24 hours

  • Smooth running with empty target
  • 6 CDC Pressure alarms: new run started each time, last one required DAQ crate reboot (delayed restart)

Shift Summary

Issues/Reports

Plan

  • RF recovery for 4 hours this morning, starting at 8 am: target testing, Kondo GEM work, mechanical checks for FCAL-II work
    • Expect to start beam recovery around noon
    • Fill target before beam returns for production data
  • Harp scan after beam is restored, more than a week since the last one (Alexandre)
  • Check calibration of CompCal modules with adjusted HV, 1 hr at low intensity (Sasha)
  • Production data with full target