=Friday, October 28= | =Friday, October 28= | ||
=== Past 24 hours === | === Past 24 hours === | ||
+ | * Returned from RF recovery around 5 pm, postponed CompCal calibration run to Friday | ||
+ | * Harp scans performed when beam restored | ||
+ | * Production running until midnight: [https://logbooks.jlab.org/entry/4071560 "smoking gun"] for burnt RF power supply | ||
=== Shift Summary === | === Shift Summary === | ||
− | * Day Oct 27 | + | * [https://logbooks.jlab.org/entry/4070930 Day Oct 27] |
* [https://logbooks.jlab.org/entry/4071234 Swing Oct 27] | * [https://logbooks.jlab.org/entry/4071234 Swing Oct 27] | ||
− | * Owl Oct 27/28 | + | * [https://logbooks.jlab.org/entry/4071480 Owl Oct 27/28] |
* Early Riser Oct 28 | * Early Riser Oct 28 | ||
=== Issues/Reports === | === Issues/Reports === | ||
+ | * [https://logbooks.jlab.org/entry/4070889 CCAL HV Adjustment] | ||
+ | * [https://logbooks.jlab.org/entry/4071417 Harp scan extrapolation] | ||
=== Plan === | === Plan === | ||
+ | * Recover from accelerator power supply issue by "early afternoon" | ||
+ | * Check calibration of CompCal modules with adjusted HV, 1 hr at low intensity (Sasha) | ||
* Production data with full target | * Production data with full target | ||
Revision as of 08:03, 28 October 2022
Meetings are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)
Hall D counting room white board
Back to Run Coordination Meetings:Fall2022
Contents
Friday, October 28
Past 24 hours
- Returned from RF recovery around 5 pm, postponed CompCal calibration run to Friday
- Harp scans performed when beam restored
- Production running until midnight: "smoking gun" for burnt RF power supply
Shift Summary
- Day Oct 27
- Swing Oct 27
- Owl Oct 27/28
- Early Riser Oct 28
Issues/Reports
Plan
- Recover from accelerator power supply issue by "early afternoon"
- Check calibration of CompCal modules with adjusted HV, 1 hr at low intensity (Sasha)
- Production data with full target
Thursday, October 27
Past 24 hours
- Smooth running with empty target
- 6 CDC Pressure alarms: new run started each time, last one required DAQ crate reboot (delayed restart)
Shift Summary
Issues/Reports
- Avoid long prestarts (Naomi)
- 32 ns shift in tagger crate (no action required)
- Do we still want beam strip charts in the logbook every 2 hours (as noted on white board)?
- SC Dark Current/Rates (Beni)
Plan
- RF recovery for 4 hours this morning, starting at 8 am: target testing, Kondo GEM work, mechanical checks for FCAL-II work
- Expect to start beam recovery around noon
- Fill target before beam returns for production data
- Harp scan after beam is restored, more than a week since the last one (Alexandre)
- Check calibration of CompCal modules with adjusted HV, 1 hr at low intensity (Sasha)
- Production data with full target