(Friday, October 28)
(Past 24 hours)
Line 14: Line 14:
 
* Harp scans performed when beam restored
 
* Harp scans performed when beam restored
 
* Production running until midnight: [https://logbooks.jlab.org/entry/4071560 "smoking gun"] for burnt RF power supply
 
* Production running until midnight: [https://logbooks.jlab.org/entry/4071560 "smoking gun"] for burnt RF power supply
 +
* [https://logbooks.jlab.org/entry/4071626 FDC chiller interlock]
  
 
=== Shift Summary ===
 
=== Shift Summary ===

Revision as of 08:39, 28 October 2022

Meetings are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)

MCC whiteboard

Hall D counting room white board

Hall D Logbook

Back to Run Coordination Meetings:Fall2022

Friday, October 28

Past 24 hours

  • Returned from RF recovery around 6 pm, postponed CompCal calibration run to Friday
  • Harp scans performed when beam restored
  • Production running until midnight: "smoking gun" for burnt RF power supply
  • FDC chiller interlock

Shift Summary

Issues/Reports

Plan

  • Recover from accelerator power supply issue by "early afternoon"
  • Check calibration of CompCal modules with adjusted HV, 1 hr at low intensity (Sasha)
  • Production data with full target

Thursday, October 27

Past 24 hours

  • Smooth running with empty target
  • 6 CDC Pressure alarms: new run started each time, last one required DAQ crate reboot (delayed restart)

Shift Summary

Issues/Reports

Plan

  • RF recovery for 4 hours this morning, starting at 8 am: target testing, Kondo GEM work, mechanical checks for FCAL-II work
    • Expect to start beam recovery around noon
    • Fill target before beam returns for production data
  • Harp scan after beam is restored, more than a week since the last one (Alexandre)
  • Check calibration of CompCal modules with adjusted HV, 1 hr at low intensity (Sasha)
  • Production data with full target