(Monday, October 31)
Line 13: Line 13:
  
 
=== Past 72 hours ===
 
=== Past 72 hours ===
* Friday afternoon TOF HV module failed, replaced (Beni and Sasha)
+
* Friday afternoon TOF HV module [https://logbooks.jlab.org/entry/4071865 failed], replaced (Beni/Sasha)
* Beam returned early Saturday morning
+
* Beam returned early Saturday morning and was smooth most of the weekend
  
 
=== Shift Summary ===
 
=== Shift Summary ===
 +
* [https://logbooks.jlab.org/entry/4071702 Day Oct 28]
 +
* [https://logbooks.jlab.org/entry/4071996 Swing Oct 28]
 +
* [https://logbooks.jlab.org/entry/4072081 Owl Oct 28/29]
 +
* [https://logbooks.jlab.org/entry/4072325 Early Riser Oct 29]
 +
* [https://logbooks.jlab.org/entry/4072561 Day Oct 29]
 +
* [https://logbooks.jlab.org/entry/4072741 Swing Oct 29]
 +
* [https://logbooks.jlab.org/entry/4072986 Owl Oct 29/30]
 +
* [https://logbooks.jlab.org/entry/4073195 Early Riser Oct 30]
 +
* [https://logbooks.jlab.org/entry/4073408 Day Oct 29]
 +
* [https://logbooks.jlab.org/entry/4073568 Swing Oct 29]
 +
* [https://logbooks.jlab.org/entry/4073694 Owl Oct 29/30]
 +
* [https://logbooks.jlab.org/entry/4073866 Early Riser Oct 30]
  
 
=== Issues/Reports ===
 
=== Issues/Reports ===
 +
* [https://logbooks.jlab.org/entry/4073434 FDC translation table needs update for PrimEx] (Justin/Lubomir)
  
 
=== Plan ===
 
=== Plan ===
* Production running on full target
+
* Production running on full target.  When to change to empty?
* Accelerator: Hall A pass change on Wednesday and then maintenance day (access) on Thursday this week
+
* [https://logbooks.jlab.org/entry/4073876 Request for raw mode running with beam (none for PrimEx yet)] (Lubomir)
 +
* Calibration of CompCal modules with adjusted HV, 1 hr at low intensity (Sasha)
 +
* Accelerator: Hall A pass change and maintenance day (access) on Wednesday this week
  
 
=Friday, October 28=
 
=Friday, October 28=
Line 43: Line 58:
 
=== Plan ===
 
=== Plan ===
 
* Recover from accelerator power supply issue by "early afternoon"
 
* Recover from accelerator power supply issue by "early afternoon"
* Check calibration of CompCal modules with adjusted HV, 1 hr at low intensity (Sasha)
+
* Calibration of CompCal modules with adjusted HV, 1 hr at low intensity (Sasha)
 
* Production data with full target
 
* Production data with full target
  
Line 69: Line 84:
 
** Fill target before beam returns for production data
 
** Fill target before beam returns for production data
 
* Harp scan after beam is restored, more than a week since the last one (Alexandre)
 
* Harp scan after beam is restored, more than a week since the last one (Alexandre)
* Check calibration of CompCal modules with adjusted HV, 1 hr at low intensity (Sasha)
+
* Calibration of CompCal modules with adjusted HV, 1 hr at low intensity (Sasha)
 
* Production data with full target
 
* Production data with full target

Revision as of 08:11, 31 October 2022

Meetings are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)

MCC whiteboard

Hall D counting room white board

Hall D Logbook

Back to Run Coordination Meetings:Fall2022

Monday, October 31

Happy Halloween!

Past 72 hours

  • Friday afternoon TOF HV module failed, replaced (Beni/Sasha)
  • Beam returned early Saturday morning and was smooth most of the weekend

Shift Summary

Issues/Reports

Plan

Friday, October 28

Past 24 hours

  • Returned from RF recovery around 6 pm, postponed CompCal calibration run to Friday
  • Harp scans performed when beam restored
  • Production running until midnight: "smoking gun" for burnt RF power supply
  • FDC chiller interlock

Shift Summary

Issues/Reports

Plan

  • Recover from accelerator power supply issue by "early afternoon"
  • Calibration of CompCal modules with adjusted HV, 1 hr at low intensity (Sasha)
  • Production data with full target

Thursday, October 27

Past 24 hours

  • Smooth running with empty target
  • 6 CDC Pressure alarms: new run started each time, last one required DAQ crate reboot (delayed restart)

Shift Summary

Issues/Reports

Plan

  • RF recovery for 4 hours this morning, starting at 8 am: target testing, Kondo GEM work, mechanical checks for FCAL-II work
    • Expect to start beam recovery around noon
    • Fill target before beam returns for production data
  • Harp scan after beam is restored, more than a week since the last one (Alexandre)
  • Calibration of CompCal modules with adjusted HV, 1 hr at low intensity (Sasha)
  • Production data with full target