=Wednesday, October 12=
 +
=== Past 24 hours ===
 +
* Relatively smooth running on empty target
 +
* ...
 +
 +
* Shift Summary
 +
** [https://logbooks.jlab.org/entry/4054973 Early Riser Tuesday]
 +
** [https://logbooks.jlab.org/entry/4055173 Day Tuesday]
 +
** [https://logbooks.jlab.org/entry/4055499 Swing Tuesday]
 +
** [https://logbooks.jlab.org/entry/4055805 Owl Tuesday/Wednesday]
 +
** [https://logbooks.jlab.org/entry/4056119 Early Riser Wednesday]
 +
 +
 +
* ABUs:  4.0+6.0+6.8 =16.8 hrs
 +
 +
* Data Summary: ~1B triggers on empty target
 +
 +
 +
=== Issues ===
 +
*
 +
 +
=== Plan ===
 +
* Take data with Empty Target until ~1.8B triggers
 +
* Thursday day shift: Wien anggle change and pass change for Hall A; concurrently Hall D Safety training at 9:30 am (M. Dalton)?????????; David Hamlette had been informed that we need a survey of tagger hall. However, MCC is non-committal on when and how long.
 +
* Opportunistic: EIC calorimeter prototype installation at PS calorimeter; need one hour (maybe Thursday?); contact Sasha
  
 
=Tuesday, October 11=
 
=Tuesday, October 11=
Line 26: Line 52:
 
* Data Summary: ~ 3.5B good triggers since data taking resumed on Sunday
 
* Data Summary: ~ 3.5B good triggers since data taking resumed on Sunday
  
* Upcoming
 
** Thursday day shift: pass change for Hall A; concurrently Hall D Safety training at 9:30 am (M. Dalton)
 
  
 
=== Issues ===
 
=== Issues ===
 
+
* Alexandre Deur: RCDB has not been recording runs since mid-day yesterday (Sergey & Sasha informed); could this be added to the shift check list?
  
 
=== Plan ===
 
=== Plan ===
 
* Take data with Full Target until at least after this meeting
 
* Take data with Full Target until at least after this meeting
 +
* Empty the target: beam off or on during this time?
 +
* Take xxB triggers on empty target
 +
* Thursday day shift: pass change for Hall A; concurrently Hall D Safety training at 9:30 am (M. Dalton); David Hamlette had been informed that we need a survey of tagger hall.
 +
* Opportunistic: EIC calorimeter prototype installation at PS calorimeter; need one hour (maybe Thursday?); contact Sasha
  
 
=Monday, October 10=
 
=Monday, October 10=

Latest revision as of 08:43, 12 October 2022

Meetings are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)

MCC whiteboard

Hall D counting room white board

Hall D Logbook

Back to Run Coordination Meetings:Fall2022

Wednesday, October 12

Past 24 hours

  • Relatively smooth running on empty target
  • ...


  • ABUs: 4.0+6.0+6.8 =16.8 hrs
  • Data Summary: ~1B triggers on empty target


Issues

Plan

  • Take data with Empty Target until ~1.8B triggers
  • Thursday day shift: Wien anggle change and pass change for Hall A; concurrently Hall D Safety training at 9:30 am (M. Dalton)?????????; David Hamlette had been informed that we need a survey of tagger hall. However, MCC is non-committal on when and how long.
  • Opportunistic: EIC calorimeter prototype installation at PS calorimeter; need one hour (maybe Thursday?); contact Sasha

Tuesday, October 11

Past 24 hours


  • ABUs: 2.4+6.1+6.7 hrs
  • Data Summary: ~ 3.5B good triggers since data taking resumed on Sunday


Issues

  • Alexandre Deur: RCDB has not been recording runs since mid-day yesterday (Sergey & Sasha informed); could this be added to the shift check list?

Plan

  • Take data with Full Target until at least after this meeting
  • Empty the target: beam off or on during this time?
  • Take xxB triggers on empty target
  • Thursday day shift: pass change for Hall A; concurrently Hall D Safety training at 9:30 am (M. Dalton); David Hamlette had been informed that we need a survey of tagger hall.
  • Opportunistic: EIC calorimeter prototype installation at PS calorimeter; need one hour (maybe Thursday?); contact Sasha

Monday, October 10

Past 24 hours

Issues

  • TOF crate/fADC (Sasha)
  • CDC HV issue with a board newly installed possibly a HV main frame issue, rapid access requested to place the board elsewhere in the frame (Beni)
  • No beam for a long time (~8h): Hall A ion chamber calibration, RF issue (CPS breaker tripped, P5 HorizSep Trip, VertSep Cav2 Trip )
  • Hole in FCAL for Compton events
  • FDC HV issue (solved) (Lubomir)
  • Excursion in y (Hovanes/Brian)

Plan

  • Take data with Full Target until ??????

Sunday, October 9

Past 24 hours

Issues

Plan

  • Rapid access to replace TOF ADC

Thursday, October 6

Past 24 hours

Issues

  • MCC still trying to fix magnets

Plan

  • Production data on helium target