* Relatively smooth running
 
* Relatively smooth running
 +
* 9:00 - ?? Beam off: [https://logbooks.jlab.org/entry/4053859 MCC Checking 5th Pass Horizontal Separator Phase]
 
* Shift Summary
 
* Shift Summary
 
** [https://logbooks.jlab.org/entry/4053625 Early Riser Monday]
 
** [https://logbooks.jlab.org/entry/4053625 Early Riser Monday]

Revision as of 07:37, 11 October 2022

Meetings are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)

MCC whiteboard

Hall D counting room white board

Hall D Logbook

Back to Run Coordination Meetings:Fall2022

Tuesday, October 11

Past 24 hours

Issues

Plan

  • Take data with Full Target until at least after this meeting

Monday, October 10

Past 24 hours

Issues

  • TOF crate/fADC (Sasha)
  • CDC HV issue with a board newly installed possibly a HV main frame issue, rapid access requested to place the board elsewhere in the frame (Beni)
  • No beam for a long time (~8h): Hall A ion chamber calibration, RF issue (CPS breaker tripped, P5 HorizSep Trip, VertSep Cav2 Trip )
  • Hole in FCAL for Compton events
  • FDC HV issue (solved) (Lubomir)
  • Excursion in y (Hovanes/Brian)

Plan

  • Take data with Full Target until ??????

Sunday, October 9

Past 24 hours

Issues

Plan

  • Rapid access to replace TOF ADC

Thursday, October 6

Past 24 hours

Issues

  • MCC still trying to fix magnets

Plan

  • Production data on helium target