** [https://logbooks.jlab.org/entry/4054581 Owl Monday/Tuesday]
 
** [https://logbooks.jlab.org/entry/4054581 Owl Monday/Tuesday]
 
** [https://logbooks.jlab.org/entry/4054973 Early Riser Tuesday]
 
** [https://logbooks.jlab.org/entry/4054973 Early Riser Tuesday]
*** 111007 02:28 - 04:28 337M events, 200 nA, 50KHz, LHe full target, 10^-4 Al.
+
 
*** 111008 04:30 - 06:30 323M events, 200 nA, 50KHz, LHe full target, 10^-4 Al.
+
 
*** 111009 06:33 - xx:xx XXM events, 200 nA, 50KHz, LHe full target, 10^-4 Al.
+
* ABU BANU BNA
 +
 
 +
Day Shift Total 126.7667 46.1 307.1333
 +
Swing Shift Total 381.1833 7.6167 91.2
  
 
* Data Summary
 
* Data Summary
 +
 +
* Upcoming
 +
** Thursday day shift: pass change for Hall A; concurrently Hall D Safety training at 9:30 am (M. Dalton)
  
 
=== Issues ===
 
=== Issues ===

Revision as of 08:14, 11 October 2022

Meetings are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)

MCC whiteboard

Hall D counting room white board

Hall D Logbook

Back to Run Coordination Meetings:Fall2022

Tuesday, October 11

Past 24 hours


  • ABU BANU BNA

Day Shift Total 126.7667 46.1 307.1333 Swing Shift Total 381.1833 7.6167 91.2

  • Data Summary
  • Upcoming
    • Thursday day shift: pass change for Hall A; concurrently Hall D Safety training at 9:30 am (M. Dalton)

Issues

Plan

  • Take data with Full Target until at least after this meeting

Monday, October 10

Past 24 hours

Issues

  • TOF crate/fADC (Sasha)
  • CDC HV issue with a board newly installed possibly a HV main frame issue, rapid access requested to place the board elsewhere in the frame (Beni)
  • No beam for a long time (~8h): Hall A ion chamber calibration, RF issue (CPS breaker tripped, P5 HorizSep Trip, VertSep Cav2 Trip )
  • Hole in FCAL for Compton events
  • FDC HV issue (solved) (Lubomir)
  • Excursion in y (Hovanes/Brian)

Plan

  • Take data with Full Target until ??????

Sunday, October 9

Past 24 hours

Issues

Plan

  • Rapid access to replace TOF ADC

Thursday, October 6

Past 24 hours

Issues

  • MCC still trying to fix magnets

Plan

  • Production data on helium target