* Data Summary: ~ 3.5B good triggers since data taking resumed on Sunday
 
* Data Summary: ~ 3.5B good triggers since data taking resumed on Sunday
  
* Upcoming
 
** Thursday day shift: pass change for Hall A; concurrently Hall D Safety training at 9:30 am (M. Dalton)
 
  
 
=== Issues ===
 
=== Issues ===
Line 34: Line 32:
 
=== Plan ===
 
=== Plan ===
 
* Take data with Full Target until at least after this meeting
 
* Take data with Full Target until at least after this meeting
 +
* Take xxB triggers on empty target
 +
* Thursday day shift: pass change for Hall A; concurrently Hall D Safety training at 9:30 am (M. Dalton)
  
 
=Monday, October 10=
 
=Monday, October 10=

Revision as of 08:24, 11 October 2022

Meetings are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)

MCC whiteboard

Hall D counting room white board

Hall D Logbook

Back to Run Coordination Meetings:Fall2022

Tuesday, October 11

Past 24 hours


  • ABUs: 2.4+6.1+6.7 hrs
  • Data Summary: ~ 3.5B good triggers since data taking resumed on Sunday


Issues

  • Alexandre Deur: RCDB has not been recording runs since mid-day yesterday (Sergey & Sasha informed); could this be added to the shift check list?

Plan

  • Take data with Full Target until at least after this meeting
  • Take xxB triggers on empty target
  • Thursday day shift: pass change for Hall A; concurrently Hall D Safety training at 9:30 am (M. Dalton)

Monday, October 10

Past 24 hours

Issues

  • TOF crate/fADC (Sasha)
  • CDC HV issue with a board newly installed possibly a HV main frame issue, rapid access requested to place the board elsewhere in the frame (Beni)
  • No beam for a long time (~8h): Hall A ion chamber calibration, RF issue (CPS breaker tripped, P5 HorizSep Trip, VertSep Cav2 Trip )
  • Hole in FCAL for Compton events
  • FDC HV issue (solved) (Lubomir)
  • Excursion in y (Hovanes/Brian)

Plan

  • Take data with Full Target until ??????

Sunday, October 9

Past 24 hours

Issues

Plan

  • Rapid access to replace TOF ADC

Thursday, October 6

Past 24 hours

Issues

  • MCC still trying to fix magnets

Plan

  • Production data on helium target