Difference between revisions of "Run Planning Meeting Notes, October 7 - October 13, 2021"

From GlueXWiki
Jump to: navigation, search
(Wednesday, October 13)
(Wednesday, October 13)
Line 5: Line 5:
 
#* Swing summary:  
 
#* Swing summary:  
 
#* Day summary: https://logbooks.jlab.org/entry/3922741
 
#* Day summary: https://logbooks.jlab.org/entry/3922741
 +
#* Offline skim are now available https://logbooks.jlab.org/entry/3922774 (Sean)
 +
#* Lowered HV on FDC2 Cell3 HV1p  https://logbooks.jlab.org/entry/3922784 (Lubomir)
 +
#* Mirror test results https://logbooks.jlab.org/entry/3922828 (Bill)
 
# Issues:
 
# Issues:
 +
#* RCDB info was missing & host problem (Sergey)
 +
#* Solenoid Coil Vaccum Stripchart https://logbooks.jlab.org/entry/3922338 & https://logbooks.jlab.org/entry/3922646 (Tim/Joerg)
 
#* Bleedthrough
 
#* Bleedthrough
 
#** Some beam in tagger hall shows spikes in some tagger hodoscope counters https://logbooks.jlab.org/entry/3922750 (Beni)
 
#** Some beam in tagger hall shows spikes in some tagger hodoscope counters https://logbooks.jlab.org/entry/3922750 (Beni)

Revision as of 13:18, 12 October 2021

Wednesday, October 13

  1. In last 24 hours:
  2. Issues:
  3. Plan:

Tuesday, October 12

  1. In last 24 hours:
  2. Issues:
  3. Plan:
    • Take production data at 200 nA w/ target filled w/ He

Monday, October 11

  1. In last 72 hours:
  2. Issues:
  3. Plan:

Friday, October 8

  1. In last 24 hours:
  2. Issues:
  3. Plan:
    • 100 nA (2 shifts)
    • Turn the magnet on and ramp to low current (50A)
    • Hall A will be back online Monday morning
    • Tuesday Beam study / RF recovery will probably be postponed to a later day

Thursday, October 7

  1. In last 24 hours:
  2. Issues:
  3. Plan:
    • Special run for BCAL, TPOL retracted, 5 mn beam at 200 nA, normal DAQ cfg
    • 200 nA CDC & FDC turn off (3 shifts)
    • 100 nA CDC & FDC turn off (2 shifts)
    • MCC will run the Moller at helicity flip rate for HallB which might disrupt HallD beam
    • If Hall A is back online today (unlikely most probably tomorrow)
      • Check radiation
      • HARP scan
      • Bleedthrough run with 10 kHz random pulser, HallD laser turn off, and no beam for 40mn