Difference between revisions of "Run Planning Meeting Notes, Sep 20-27, 2018"
From GlueXWiki
(→Monday, Sep 24 at 08:45) |
(→Monday, Sep 24 at 08:45) |
||
Line 10: | Line 10: | ||
#CEBAF: | #CEBAF: | ||
#* More PSS drops over the weekend. General rhythm: Day shift fixes it by swing. Swing tries to establish beam to halld. Machine has issues over night, which are fixed during day shift | #* More PSS drops over the weekend. General rhythm: Day shift fixes it by swing. Swing tries to establish beam to halld. Machine has issues over night, which are fixed during day shift | ||
− | #* Issues with extracting beams to halls A/B/C meant it was all halld | + | #* Issues with extracting beams to halls A/B/C meant it was all halld over the weekend. |
#* Sunday evening saw more CW beam but issues with positioning. Ultimately tagger magnet was increased by 1A and finished fixing the position issues. | #* Sunday evening saw more CW beam but issues with positioning. Ultimately tagger magnet was increased by 1A and finished fixing the position issues. | ||
#* Overnight saw some straight track running with Hovanes doing the flux optimization today. | #* Overnight saw some straight track running with Hovanes doing the flux optimization today. |
Revision as of 08:37, 24 September 2018
<- Back to Run Coordination Meetings:Fall2018 Run
Monday, Sep 24 at 08:45
- Notes from the previous 48 hours:
- CEBAF:
- More PSS drops over the weekend. General rhythm: Day shift fixes it by swing. Swing tries to establish beam to halld. Machine has issues over night, which are fixed during day shift
- Issues with extracting beams to halls A/B/C meant it was all halld over the weekend.
- Sunday evening saw more CW beam but issues with positioning. Ultimately tagger magnet was increased by 1A and finished fixing the position issues.
- Overnight saw some straight track running with Hovanes doing the flux optimization today.
- SL access today, providing time to attempt repairs to the solenoid (may be a comm issue)
- Action Items:
- Issues: Solenoid PS
- Reports:
- Run Plan: Hovanes flux optimization/AC calibration. Sergey DAQ work. CDC HV scan? Detector calibrations?
- AOB
Friday , Sep 21 at 08:45
- Notes from the previous 24 hours:
- CEBAF:
- 2 PSS drops yesterday. Believed to have been communications related
- "Knocking on Hall-D tagger's door"
- Collimator in indeterminate state. Richard reports it isn't moving. Hovannes is in working on it. (fixed by reset)
- priorities from Accelorator: 1) get in to the tagger. 2) establish CW beam -- they expect all of this today (one shift)
- Action Items:
- Issues
- Reports:
- Run Plan:
- AOB
Thursday , Sep 20 at 08:45
- Notes from the previous 24 hours:
- CEBAF:
- Arc 5 trips with "overtemp". Believed to be a bad Klixon.
- 5th pass separator (horizontal) issue. Should be fixed today
- Currently at 9R. Briefly able to get to Hall-C dumplet
- Today’s plan: "mini Maintenance day" with NL access
- Hall-D closed @3pm today
- Action Items:
- Hot Check OUT Status 95% ready ; 0% checked ; 5% not ready
- Issues
- Reports:
- Run Plan:
- AOB