* [https://calendar.google.com/calendar/embed?src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America%2FNew_York Accel. Plan Google Calendar] | * [https://calendar.google.com/calendar/embed?src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America%2FNew_York Accel. Plan Google Calendar] | ||
+ | |||
+ | == Tuesday, Sep 25 at 08:45 == | ||
+ | # Notes from the previous 48 hours: | ||
+ | #CEBAF: | ||
+ | #* Access went well, beam pipe was 16.5mm beam right. PSS re-terminations. Solenoid PS fixed *knocking on wood* and was sucessfully ramped to the nominal current of 1350 A | ||
+ | #* Cryo fire?...no, just a bad smoke detector | ||
+ | #* Calibrations ongoing, timings are off. Sean is working on it. | ||
+ | #* MCC focusing today on getting high current to Hall C. Aiming for 10 uA. This could take all day... | ||
+ | |||
+ | #Action Items: | ||
+ | #Issues: Make e-log button on rootspy not working? | ||
+ | # Reports: | ||
+ | # Run Plan: DAQ work. Diamond alignment? Continue detector checkouts. What to do overnight? | ||
+ | #*[http://accboard.acc.jlab.org/ Acc whiteboard] | ||
+ | #*[https://halldweb.jlab.org/online/whiteboard/ Counting house whiteboard] | ||
+ | # AOB | ||
+ | |||
== Monday, Sep 24 at 08:45 == | == Monday, Sep 24 at 08:45 == |
Revision as of 08:35, 25 September 2018
<- Back to Run Coordination Meetings:Fall2018 Run
Contents
Tuesday, Sep 25 at 08:45
- Notes from the previous 48 hours:
- CEBAF:
- Access went well, beam pipe was 16.5mm beam right. PSS re-terminations. Solenoid PS fixed *knocking on wood* and was sucessfully ramped to the nominal current of 1350 A
- Cryo fire?...no, just a bad smoke detector
- Calibrations ongoing, timings are off. Sean is working on it.
- MCC focusing today on getting high current to Hall C. Aiming for 10 uA. This could take all day...
- Action Items:
- Issues: Make e-log button on rootspy not working?
- Reports:
- Run Plan: DAQ work. Diamond alignment? Continue detector checkouts. What to do overnight?
- AOB
Monday, Sep 24 at 08:45
- Notes from the previous 48 hours:
- CEBAF:
- More PSS drops over the weekend. General rhythm: Day shift fixes it by swing. Swing tries to establish beam to halld. Machine has issues over night, which are fixed during day shift
- Issues with extracting beams to halls A/B/C meant it was all halld over the weekend.
- Sunday evening saw more CW beam but issues with positioning. Ultimately tagger magnet was increased by 1A and finished fixing the position issues.
- Overnight saw some straight track running with Hovanes doing the flux optimization today.
- SL access today, providing time to attempt repairs to the solenoid (may be a comm issue)
- Action Items:
- Issues: Solenoid PS
- Reports:
- Run Plan: Hovanes flux optimization/AC calibration. Sergey DAQ work. CDC HV scan? Detector calibrations?
- AOB
Friday , Sep 21 at 08:45
- Notes from the previous 24 hours:
- CEBAF:
- 2 PSS drops yesterday. Believed to have been communications related
- "Knocking on Hall-D tagger's door"
- Collimator in indeterminate state. Richard reports it isn't moving. Hovannes is in working on it. (fixed by reset)
- priorities from Accelorator: 1) get in to the tagger. 2) establish CW beam -- they expect all of this today (one shift)
- Action Items:
- Issues
- Reports:
- Run Plan:
- AOB
Thursday , Sep 20 at 08:45
- Notes from the previous 24 hours:
- CEBAF:
- Arc 5 trips with "overtemp". Believed to be a bad Klixon.
- 5th pass separator (horizontal) issue. Should be fixed today
- Currently at 9R. Briefly able to get to Hall-C dumplet
- Today’s plan: "mini Maintenance day" with NL access
- Hall-D closed @3pm today
- Action Items:
- Hot Check OUT Status 95% ready ; 0% checked ; 5% not ready
- Issues
- Reports:
- Run Plan:
- AOB