Difference between revisions of "Run Planning Meeting Notes, Sep 20-27, 2018"
From GlueXWiki
(→Thursday , Sep 20 at 08:45) |
(→Thursday , Sep 20 at 08:45) |
||
Line 9: | Line 9: | ||
# Notes from the previous 24 hours: | # Notes from the previous 24 hours: | ||
#CEBAF: | #CEBAF: | ||
− | #* Arc 5 trips | + | #* Arc 5 trips with "overtemp". Possible bad klixon. |
− | #* 5th pass separator (horizontal) issue | + | #* 5th pass separator (horizontal) issue. Should be fixed today |
− | #* currently at 9R | + | #* currently at 9R (briefly able to get to Hall-C dumplet |
− | #* Today’s plan: Maintenance with NL access | + | #* Today’s plan: "mini Maintenance day" with NL access |
#* Hall D closed @3pm today | #* Hall D closed @3pm today | ||
#Action Items: | #Action Items: | ||
− | #* [https://accweb.acc.jlab.org/hco/reports/overall-status?destinationId=9&categoryId=401&systemId=®ionId=29&groupId=&qualified= Hot Check OUT Status] <span style="color:green"> | + | #* [https://accweb.acc.jlab.org/hco/reports/overall-status?destinationId=9&categoryId=401&systemId=®ionId=29&groupId=&qualified= Hot Check OUT Status] <span style="color:green"> 95% ready </span>; <span style="color:#BABC3A">0% checked </span>; <span style="color:red">5% not ready </span> |
#Issues | #Issues | ||
# Reports: | # Reports: | ||
− | # Run Plan | + | # Run Plan: |
# AOB | # AOB |
Revision as of 08:25, 20 September 2018
<- Back to Run Coordination Meetings:Fall2018 Run
Thursday , Sep 20 at 08:45
- Notes from the previous 24 hours:
- CEBAF:
- Arc 5 trips with "overtemp". Possible bad klixon.
- 5th pass separator (horizontal) issue. Should be fixed today
- currently at 9R (briefly able to get to Hall-C dumplet
- Today’s plan: "mini Maintenance day" with NL access
- Hall D closed @3pm today
- Action Items:
- Hot Check OUT Status 95% ready ; 0% checked ; 5% not ready
- Issues
- Reports:
- Run Plan:
- AOB