Difference between revisions of "Run Planning Meeting Notes, Sep 20-27, 2018"
From GlueXWiki
(→Thursday , Sep 20 at 08:45) |
(→Thursday , Sep 20 at 08:45) |
||
Line 9: | Line 9: | ||
# Notes from the previous 24 hours: | # Notes from the previous 24 hours: | ||
#CEBAF: | #CEBAF: | ||
− | #* Arc 5 trips with "overtemp". | + | #* Arc 5 trips with "overtemp". Believed to be a bad Klixon. |
#* 5th pass separator (horizontal) issue. Should be fixed today | #* 5th pass separator (horizontal) issue. Should be fixed today | ||
− | #* | + | #* Currently at 9R. Briefly able to get to Hall-C dumplet |
#* Today’s plan: "mini Maintenance day" with NL access | #* Today’s plan: "mini Maintenance day" with NL access | ||
− | #* Hall D closed @3pm today | + | #* Hall-D closed @3pm today |
#Action Items: | #Action Items: | ||
#* [https://accweb.acc.jlab.org/hco/reports/overall-status?destinationId=9&categoryId=401&systemId=®ionId=29&groupId=&qualified= Hot Check OUT Status] <span style="color:green"> 95% ready </span>; <span style="color:#BABC3A">0% checked </span>; <span style="color:red">5% not ready </span> | #* [https://accweb.acc.jlab.org/hco/reports/overall-status?destinationId=9&categoryId=401&systemId=®ionId=29&groupId=&qualified= Hot Check OUT Status] <span style="color:green"> 95% ready </span>; <span style="color:#BABC3A">0% checked </span>; <span style="color:red">5% not ready </span> |
Revision as of 08:33, 20 September 2018
<- Back to Run Coordination Meetings:Fall2018 Run
Thursday , Sep 20 at 08:45
- Notes from the previous 24 hours:
- CEBAF:
- Arc 5 trips with "overtemp". Believed to be a bad Klixon.
- 5th pass separator (horizontal) issue. Should be fixed today
- Currently at 9R. Briefly able to get to Hall-C dumplet
- Today’s plan: "mini Maintenance day" with NL access
- Hall-D closed @3pm today
- Action Items:
- Hot Check OUT Status 95% ready ; 0% checked ; 5% not ready
- Issues
- Reports:
- Run Plan:
- AOB