(Monday, Sep 24 at 08:45)
(Monday, Sep 24 at 08:45)
Line 10: Line 10:
 
#CEBAF:
 
#CEBAF:
 
#* More PSS drops over the weekend.  General rhythm: Day shift fixes it by swing.  Swing tries to establish beam to halld.  Machine has issues over night, which are fixed during day shift
 
#* More PSS drops over the weekend.  General rhythm: Day shift fixes it by swing.  Swing tries to establish beam to halld.  Machine has issues over night, which are fixed during day shift
#* Issues with extracting beams to halls A/B/C meant it was all halld Sunday
+
#* Issues with extracting beams to halls A/B/C meant it was all halld over the weekend.
 
#* Sunday evening saw more CW beam but issues with positioning. Ultimately tagger magnet was increased by 1A and finished fixing the position issues.
 
#* Sunday evening saw more CW beam but issues with positioning. Ultimately tagger magnet was increased by 1A and finished fixing the position issues.
 
#* Overnight saw some straight track running with Hovanes doing the flux optimization today.
 
#* Overnight saw some straight track running with Hovanes doing the flux optimization today.

Revision as of 08:37, 24 September 2018

<- Back to Run Coordination Meetings:Fall2018 Run

Monday, Sep 24 at 08:45

  1. Notes from the previous 48 hours:
  2. CEBAF:
    • More PSS drops over the weekend. General rhythm: Day shift fixes it by swing. Swing tries to establish beam to halld. Machine has issues over night, which are fixed during day shift
    • Issues with extracting beams to halls A/B/C meant it was all halld over the weekend.
    • Sunday evening saw more CW beam but issues with positioning. Ultimately tagger magnet was increased by 1A and finished fixing the position issues.
    • Overnight saw some straight track running with Hovanes doing the flux optimization today.
    • SL access today, providing time to attempt repairs to the solenoid (may be a comm issue)


  1. Action Items:
  2. Issues: Solenoid PS
  3. Reports:
  4. Run Plan: Hovanes flux optimization/AC calibration. Sergey DAQ work. CDC HV scan? Detector calibrations?
  5. AOB

Friday , Sep 21 at 08:45

  1. Notes from the previous 24 hours:
  2. CEBAF:
    • 2 PSS drops yesterday. Believed to have been communications related
    • "Knocking on Hall-D tagger's door"
    • Collimator in indeterminate state. Richard reports it isn't moving. Hovannes is in working on it. (fixed by reset)
    • priorities from Accelorator: 1) get in to the tagger. 2) establish CW beam -- they expect all of this today (one shift)
  1. Action Items:
  2. Issues
  3. Reports:
  4. Run Plan:
  5. AOB

Thursday , Sep 20 at 08:45

  1. Notes from the previous 24 hours:
  2. CEBAF:
    • Arc 5 trips with "overtemp". Believed to be a bad Klixon.
    • 5th pass separator (horizontal) issue. Should be fixed today
    • Currently at 9R. Briefly able to get to Hall-C dumplet
    • Today’s plan: "mini Maintenance day" with NL access
    • Hall-D closed @3pm today
  3. Action Items:
  4. Issues
  5. Reports:
  6. Run Plan:
  7. AOB