(Monday, Oct 1 at 08:45)
(Monday, Oct 1 at 08:45)
Line 17: Line 17:
 
#*Sunday owl [https://logbooks.jlab.org/entry/3601137 No beam - injector problems]
 
#*Sunday owl [https://logbooks.jlab.org/entry/3601137 No beam - injector problems]
 
#*Sunday day MCC say the beam is not physics quality (energy spread is too wide), will work on this with the hope of restoring beam towards the end of the day shift (it returns at around noon, but not for long).  
 
#*Sunday day MCC say the beam is not physics quality (energy spread is too wide), will work on this with the hope of restoring beam towards the end of the day shift (it returns at around noon, but not for long).  
#*Sunday swing Beam returns but convergence is bad, MCC work to improve it.
+
#*Sunday swing Beam returns but convergence is bad, MCC work to improve it. CBrems enhancement way off template, improved with new amo template.
 +
#*Sunday owl many trips
 
#CEBAF:
 
#CEBAF:
 
#Action Items:
 
#Action Items:

Revision as of 06:59, 1 October 2018

<- Back to Run Coordination Meetings:Fall2018 Run


Monday, Oct 1 at 08:45

  1. Notes from the previous 72 hours:
  2. CEBAF:
  3. Action Items:
  4. Issues:
  5. Reports:
    • Monitoring
  6. Run Plan: Run plan
  7. AOB

Friday, Sep 28 at 08:45

  1. Notes from the previous 24 hours:
    • Beam position erratic throughout the day & first half of swing day swing
    • Energy drift pathlength corrected
    • Sergey completed first set of DAQ tests
    • Stabilized mid-swing enough to attempt alignment but spot is huge 1.2 x 1.5mm
    • Aligned 0/90, still need to do 45/135
    • Collected 'production' data overnight, concerned about quality cobrems gui
    • Whiteboard camera improved
    • BOR records are back
  2. CEBAF:
    • Expect 2h downtime from 9am for HA to go to 2 pass; MCC will work on our optics during that time
  3. Action Items:
    • Update reference plots (CDC's new ref colz scale is off)
  4. Issues:
    • Beam
    • Network problems
    • Rootspy is often unable to find histos & make log entry, loses processes, need to start & stop monitoring w hdmongui.
      • Try start first. Open out the gui and count the # respawned processes, send info to David.
    • Plot browser fix in progress
  5. Reports:
  6. Run Plan: Run plan
    • Beam off at 9 for pass change
    • Sasha PS (Sat, 1h) and Richard TAGM threshold not done yet
    • Coordinate with C for TAC run - on or after Wed (otherwise need access), plan to install converter on Tuesday
    • Acc whiteboard
    • Counting house whiteboard
  7. AOB