Difference between revisions of "Run Planning Meeting Notes, Sep 28-Oct 3, 2018"

From GlueXWiki
Jump to: navigation, search
(Monday, Oct 1 at 08:45)
(Wednesday, Oct 3 at 08:45)
 
(43 intermediate revisions by the same user not shown)
Line 6: Line 6:
 
* [https://calendar.google.com/calendar/embed?src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America%2FNew_York Accel. Plan Google Calendar]
 
* [https://calendar.google.com/calendar/embed?src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America%2FNew_York Accel. Plan Google Calendar]
  
 +
== Wednesday, Oct 3 at 08:45 ==
 +
# Notes from the previous 24 hours:
 +
#* Sasha completed PS trigger studies
 +
#* 6 hopefully good production runs
 +
#* Lost beam for half of swing w He fault in accelerator; less stable during owl & then off for 2h for cryo module failure
 +
#* Length of run -> 300M & 150M (<2h for calibrations, daq is running much better than previously, full cycle of 5 runs takes too long)
 +
#CEBAF:
 +
#Action Items:
 +
#* Microscope occupancy is off - should be fixed when Richard has loaded new thresholds
 +
#Issues:
 +
#* Few daq issues - ending runs, and rate dropped towards end of day shift
 +
#* Goniometer camera stuck in owl, ok after restarting gui
 +
#*[https://logbooks.jlab.org/entry/3602980 Rates on diamond are decreasing (Alexandre)]
 +
# Reports:
 +
#*Monitoring
 +
# Run Plan:
 +
#* [https://halldweb.jlab.org/wiki/images/a/a7/Fall18_week2.jpg Week 2] [https://halldweb.jlab.org/wiki/images/4/49/Fall18_week3.jpg Week 3] [https://halldweb.jlab.org/wiki/images/d/de/Fall18_week4.jpg Week 4]
 +
#*TAC run prep on Thursday
 +
#** 0930 Quick access for Hovanes with ARM to install the Pb converter;  also remember to call Melvin from radcon to fix the alarm (number on whiteboard & alarm)
 +
#** Hovanes will calibrate A.C. high gain setting on Thurs am.
 +
#*TAC run on Friday
 +
#**Hall C will be down from 7am for 6-8h
 +
#**MCC need ~2h to set up low current, ETA 0830-0900, setup DAQ (~1h, Sasha), take data for 4-5h.  (Go to 30nA & V-wire if we run out of single-hall time). 
 +
#*[http://accboard.acc.jlab.org/ Acc whiteboard]
 +
#*[https://halldweb.jlab.org/online/whiteboard/ Counting house whiteboard]
 +
# AOB
 +
#*Next RC: Stuart Fegan
 +
#*(Offline note for Stuart: add Curtis's spreadsheet to the RC notes for the meeting tomorrow)
 +
 +
== Tuesday, Oct 2 at 08:45 ==
 +
# Notes from the previous 24 hours:
 +
#* *There is NO RF recovery time scheduled for today (Tues) - cancelled ~3.30pm Mon *
 +
#*Day + part of swing shift: Mike McCaughan & Todd retuned Hall D beamline.  Beam profile looks way better and rates are back to normal. [https://logbooks.jlab.org/entry/3601945 am]  [https://logbooks.jlab.org/entry/3602235 pm]
 +
#*Swing Richard gathered TAGM threshold scan data.  Still needs to calculate & then set new thresholds. 
 +
#*Owl production 3 hopefully good production runs at 450nA (to match daq rate).  [https://logbooks.jlab.org/entry/3602383 New amo reference].  Beam position started wobbling after 5am but not too bad. 
 +
#CEBAF:
 +
#Action Items:
 +
#* Microscope occupancy is off - should be fixed when Richard has loaded new thresholds
 +
#Issues:
 +
#* [https://logbooks.jlab.org/entry/3602570 Diamond rates are falling (Alexandre)]
 +
#* [https://logbooks.jlab.org/entry/3602222 Beam energy monitoring (Alexandre)]
 +
#* Could use a logbook post on hdmongui counting respawnings
 +
#* Could also use a list of cell #s for shifters.  Email to RC, keep on desk.
 +
#* The chicken and the spoon (Alex A).
 +
# Reports:
 +
#*Monitoring
 +
#**[https://logbooks.jlab.org/entry/3602612 report from Thomas]
 +
#**[https://logbooks.jlab.org/entry/3602513 Run 520727]
 +
# Run Plan:
 +
#* [https://halldweb.jlab.org/wiki/images/a/a7/Fall18_week2.jpg Weekly schedule]
 +
#* Richard (tagm), Sasha (PS).  Outstanding: rate comparison (8h) & high rate studies (4h)
 +
#*TAC run on Friday
 +
#**Friday is good for Todd and Hall C (they will be off from 7am for 6-8h)
 +
#**We will need access to install Pb converter, & then time to calibrate A.C. high gain setting (do this on Thurs morning with ARM, 09:30 is good with radcon)
 +
#**Radcon would like to swap a part in the overactive alarm while the hall is down, will take 5 mins, we need to phone the number on the alarm box to call them in (not the survey team)
 +
#** MCC need ~2h to set up low current, setup DAQ (~1h, Sasha), take data for 4-5h.  (Go to 30nA & V-wire if we run out of single-hall time). 
 +
#*[http://accboard.acc.jlab.org/ Acc whiteboard]
 +
#*[https://halldweb.jlab.org/online/whiteboard/ Counting house whiteboard]
 +
# AOB
  
 
== Monday, Oct 1 at 08:45 ==
 
== Monday, Oct 1 at 08:45 ==
Line 16: Line 75:
 
#**[https://logbooks.jlab.org/entry/3600922 Sasha says the PS coinc rate has gone from 3.5 kHz last spring with the thicker diamond to 5.4 kHz at 530nA. Overall trigger rate is now 60 kHz & the DAQ livetime is 96%.  So our luminosity is ~ 1.5 x the spring rate.]  
 
#**[https://logbooks.jlab.org/entry/3600922 Sasha says the PS coinc rate has gone from 3.5 kHz last spring with the thicker diamond to 5.4 kHz at 530nA. Overall trigger rate is now 60 kHz & the DAQ livetime is 96%.  So our luminosity is ~ 1.5 x the spring rate.]  
 
#*Sunday owl [https://logbooks.jlab.org/entry/3601137 No beam - injector problems]
 
#*Sunday owl [https://logbooks.jlab.org/entry/3601137 No beam - injector problems]
#*Sunday day MCC say the beam they have is not physics quality (energy spread is too wide), will work on this with the hope of restoring beam towards the end of the day shift, they are aiming to get 40uA to Hall C (not the desired 65uA)
+
#*Sunday day MCC say the beam is not physics quality (energy spread is too wide), will work on this with the hope of restoring beam towards the end of the day shift (it returns at around noon, but not for long).
 +
#*Sunday swing Beam returns but convergence is bad, MCC work to improve it.  CBrems enhancement way off template, improved with new amo template.
 +
#*Sunday owl Beam (mostly on) from 2h but daq rate is only 20 kHz!   
 
#CEBAF:
 
#CEBAF:
 
#Action Items:
 
#Action Items:
 
#Issues:  
 
#Issues:  
 +
#*[https://logbooks.jlab.org/entry/3601333 ~ daily short false alarm from the counting house radiation monitor ]
 
# Reports:
 
# Reports:
 
#*Monitoring  
 
#*Monitoring  

Latest revision as of 09:25, 3 October 2018

<- Back to Run Coordination Meetings:Fall2018 Run

Wednesday, Oct 3 at 08:45

  1. Notes from the previous 24 hours:
    • Sasha completed PS trigger studies
    • 6 hopefully good production runs
    • Lost beam for half of swing w He fault in accelerator; less stable during owl & then off for 2h for cryo module failure
    • Length of run -> 300M & 150M (<2h for calibrations, daq is running much better than previously, full cycle of 5 runs takes too long)
  2. CEBAF:
  3. Action Items:
    • Microscope occupancy is off - should be fixed when Richard has loaded new thresholds
  4. Issues:
  5. Reports:
    • Monitoring
  6. Run Plan:
    • Week 2 Week 3 Week 4
    • TAC run prep on Thursday
      • 0930 Quick access for Hovanes with ARM to install the Pb converter; also remember to call Melvin from radcon to fix the alarm (number on whiteboard & alarm)
      • Hovanes will calibrate A.C. high gain setting on Thurs am.
    • TAC run on Friday
      • Hall C will be down from 7am for 6-8h
      • MCC need ~2h to set up low current, ETA 0830-0900, setup DAQ (~1h, Sasha), take data for 4-5h. (Go to 30nA & V-wire if we run out of single-hall time).
    • Acc whiteboard
    • Counting house whiteboard
  7. AOB
    • Next RC: Stuart Fegan
    • (Offline note for Stuart: add Curtis's spreadsheet to the RC notes for the meeting tomorrow)

Tuesday, Oct 2 at 08:45

  1. Notes from the previous 24 hours:
    • *There is NO RF recovery time scheduled for today (Tues) - cancelled ~3.30pm Mon *
    • Day + part of swing shift: Mike McCaughan & Todd retuned Hall D beamline. Beam profile looks way better and rates are back to normal. am pm
    • Swing Richard gathered TAGM threshold scan data. Still needs to calculate & then set new thresholds.
    • Owl production 3 hopefully good production runs at 450nA (to match daq rate). New amo reference. Beam position started wobbling after 5am but not too bad.
  2. CEBAF:
  3. Action Items:
    • Microscope occupancy is off - should be fixed when Richard has loaded new thresholds
  4. Issues:
  5. Reports:
  6. Run Plan:
    • Weekly schedule
    • Richard (tagm), Sasha (PS). Outstanding: rate comparison (8h) & high rate studies (4h)
    • TAC run on Friday
      • Friday is good for Todd and Hall C (they will be off from 7am for 6-8h)
      • We will need access to install Pb converter, & then time to calibrate A.C. high gain setting (do this on Thurs morning with ARM, 09:30 is good with radcon)
      • Radcon would like to swap a part in the overactive alarm while the hall is down, will take 5 mins, we need to phone the number on the alarm box to call them in (not the survey team)
      • MCC need ~2h to set up low current, setup DAQ (~1h, Sasha), take data for 4-5h. (Go to 30nA & V-wire if we run out of single-hall time).
    • Acc whiteboard
    • Counting house whiteboard
  7. AOB

Monday, Oct 1 at 08:45

  1. Notes from the previous 72 hours:
  2. CEBAF:
  3. Action Items:
  4. Issues:
  5. Reports:
    • Monitoring
  6. Run Plan: Run plan
  7. AOB

Friday, Sep 28 at 08:45

  1. Notes from the previous 24 hours:
    • Beam position erratic throughout the day & first half of swing day swing
    • Energy drift pathlength corrected
    • Sergey completed first set of DAQ tests
    • Stabilized mid-swing enough to attempt alignment but spot is huge 1.2 x 1.5mm
    • Aligned 0/90, still need to do 45/135
    • Collected 'production' data overnight, concerned about quality cobrems gui
    • Whiteboard camera improved
    • BOR records are back
  2. CEBAF:
    • Expect 2h downtime from 9am for HA to go to 2 pass; MCC will work on our optics during that time
  3. Action Items:
    • Update reference plots (CDC's new ref colz scale is off)
  4. Issues:
    • Beam
    • Network problems
    • Rootspy is often unable to find histos & make log entry, loses processes, need to start & stop monitoring w hdmongui.
      • Try start first. Open out the gui and count the # respawned processes, send info to David.
    • Plot browser fix in progress
  5. Reports:
  6. Run Plan: Run plan
    • Beam off at 9 for pass change
    • Sasha PS (Sat, 1h) and Richard TAGM threshold not done yet
    • Coordinate with C for TAC run - on or after Wed (otherwise need access), plan to install converter on Tuesday
    • Acc whiteboard
    • Counting house whiteboard
  7. AOB