(Friday, Sep 28 at 08:45)
Line 13: Line 13:
 
#*Stabilized mid-swing enough to attempt alignment but spot is huge 1.2 x 1.5mm
 
#*Stabilized mid-swing enough to attempt alignment but spot is huge 1.2 x 1.5mm
 
#*Collected 'production' data overnight, concerned about quality [https://logbooks.jlab.org/entry/3599614 cobrems gui]
 
#*Collected 'production' data overnight, concerned about quality [https://logbooks.jlab.org/entry/3599614 cobrems gui]
 +
#*Whiteboard camera improved
 +
#*BOR records are back
 
#CEBAF:
 
#CEBAF:
 +
#* Expect 2h downtime from 9am for HA to go to 2 pass;  MCC will work on our optics during that time
 
#Action Items:
 
#Action Items:
#* Update reference plots
+
#* Update reference plots (CDC's new ref colz scale is off)
 
#Issues:  
 
#Issues:  
 
#* Beam
 
#* Beam
 
#* Network problems
 
#* Network problems
 
#* Rootspy is often unable to find histos & make log entry, loses processes, need to start & stop monitoring w hdmongui
 
#* Rootspy is often unable to find histos & make log entry, loses processes, need to start & stop monitoring w hdmongui
 +
#* Plot browser fix in progress
 
# Reports:
 
# Reports:
 
#*Monitoring [https://logbooks.jlab.org/entry/3599512 Run 50698 (para)]
 
#*Monitoring [https://logbooks.jlab.org/entry/3599512 Run 50698 (para)]

Revision as of 08:37, 28 September 2018

<- Back to Run Coordination Meetings:Fall2018 Run

Friday, Sep 28 at 08:45

  1. Notes from the previous 24 hours:
    • Beam position erratic throughout the day & first half of swing day swing
    • Energy drift pathlength corrected
    • Sergey completed first set of DAQ tests
    • Stabilized mid-swing enough to attempt alignment but spot is huge 1.2 x 1.5mm
    • Collected 'production' data overnight, concerned about quality cobrems gui
    • Whiteboard camera improved
    • BOR records are back
  2. CEBAF:
    • Expect 2h downtime from 9am for HA to go to 2 pass; MCC will work on our optics during that time
  3. Action Items:
    • Update reference plots (CDC's new ref colz scale is off)
  4. Issues:
    • Beam
    • Network problems
    • Rootspy is often unable to find histos & make log entry, loses processes, need to start & stop monitoring w hdmongui
    • Plot browser fix in progress
  5. Reports:
  6. Run Plan: Run plan
    • Beam off at 9 for pass change
    • Sasha PS and Richard TAGM threshold not done yet
    • Coordinate with C for TAC run - on or after Wed (otherwise need access), plan to install converter on Tuesday
    • Acc whiteboard
    • Counting house whiteboard
  7. AOB