(Monday, Oct 1 at 08:45)
Line 12: Line 12:
 
#*Friday swing + owl Hovanes aligned the diamond for 45/135  
 
#*Friday swing + owl Hovanes aligned the diamond for 45/135  
 
#*Saturday owl Collected 600M triggers of production data before one of the machine quads tripped at 5am.  3h down while it was replaced.
 
#*Saturday owl Collected 600M triggers of production data before one of the machine quads tripped at 5am.  3h down while it was replaced.
#*Saturday day Beam returned long enough for Richard to collect data for TagM thresholds; then a RF module died & was replaced.   
+
#*Saturday day Beam returned long enough for Richard to collect data for TagM thresholds; then a RF module died & was replaced.  Beam restored at ~ 1pm.  Set TagM thresholds.
 +
#*Saturday swing MCC found an issue with the ion chamber calibration (2h).
 
#CEBAF:
 
#CEBAF:
 
#Action Items:
 
#Action Items:
Line 23: Line 24:
 
#*[https://halldweb.jlab.org/online/whiteboard/ Counting house whiteboard]
 
#*[https://halldweb.jlab.org/online/whiteboard/ Counting house whiteboard]
 
# AOB
 
# AOB
 
  
 
== Friday, Sep 28 at 08:45 ==
 
== Friday, Sep 28 at 08:45 ==

Revision as of 17:45, 29 September 2018

<- Back to Run Coordination Meetings:Fall2018 Run


Monday, Oct 1 at 08:45

  1. Notes from the previous 96 hours:
    • Friday day shift MCC tuned Hall D beamline, improved convergence & reduced spot size
    • Friday swing + owl Hovanes aligned the diamond for 45/135
    • Saturday owl Collected 600M triggers of production data before one of the machine quads tripped at 5am. 3h down while it was replaced.
    • Saturday day Beam returned long enough for Richard to collect data for TagM thresholds; then a RF module died & was replaced. Beam restored at ~ 1pm. Set TagM thresholds.
    • Saturday swing MCC found an issue with the ion chamber calibration (2h).
  2. CEBAF:
  3. Action Items:
  4. Issues:
  5. Reports:
    • Monitoring
  6. Run Plan: Run plan
  7. AOB

Friday, Sep 28 at 08:45

  1. Notes from the previous 24 hours:
    • Beam position erratic throughout the day & first half of swing day swing
    • Energy drift pathlength corrected
    • Sergey completed first set of DAQ tests
    • Stabilized mid-swing enough to attempt alignment but spot is huge 1.2 x 1.5mm
    • Aligned 0/90, still need to do 45/135
    • Collected 'production' data overnight, concerned about quality cobrems gui
    • Whiteboard camera improved
    • BOR records are back
  2. CEBAF:
    • Expect 2h downtime from 9am for HA to go to 2 pass; MCC will work on our optics during that time
  3. Action Items:
    • Update reference plots (CDC's new ref colz scale is off)
  4. Issues:
    • Beam
    • Network problems
    • Rootspy is often unable to find histos & make log entry, loses processes, need to start & stop monitoring w hdmongui.
      • Try start first. Open out the gui and count the # respawned processes, send info to David.
    • Plot browser fix in progress
  5. Reports:
  6. Run Plan: Run plan
    • Beam off at 9 for pass change
    • Sasha PS (Sat, 1h) and Richard TAGM threshold not done yet
    • Coordinate with C for TAC run - on or after Wed (otherwise need access), plan to install converter on Tuesday
    • Acc whiteboard
    • Counting house whiteboard
  7. AOB