(Monday, Oct 1 at 08:45)
(Monday, Oct 1 at 08:45)
Line 8: Line 8:
  
 
== Monday, Oct 1 at 08:45 ==
 
== Monday, Oct 1 at 08:45 ==
# Notes from the previous 96 hours:
+
# Notes from the previous 72 hours:
 
#*Friday day + swing shifts MCC tuned Hall D beamline, improved convergence & reduced spot size  
 
#*Friday day + swing shifts MCC tuned Hall D beamline, improved convergence & reduced spot size  
 
#*Friday late swing Hovanes aligned the diamond for 45/135  
 
#*Friday late swing Hovanes aligned the diamond for 45/135  

Revision as of 19:38, 29 September 2018

<- Back to Run Coordination Meetings:Fall2018 Run


Monday, Oct 1 at 08:45

  1. Notes from the previous 72 hours:
    • Friday day + swing shifts MCC tuned Hall D beamline, improved convergence & reduced spot size
    • Friday late swing Hovanes aligned the diamond for 45/135
    • Saturday owl Collected 600M triggers of production data before one of the machine quads tripped at 5am. 3h down while it was replaced.
    • Saturday day Beam returned long enough for Richard to collect data for TagM thresholds; then a RF module died & was replaced. Beam restored at ~ 1pm. Set TagM thresholds.
    • Saturday swing MCC found an issue with the ion chamber calibration (2h) Sasha says the PS coinc rate has gone from 3.5 last spring with the thicker diamond to 5.4 kHz at 530nA. Overall trigger rate is now 60 kHz & the DAQ livetime is 96%. So our luminosity is ~ 1.5 x the spring rate.
  2. CEBAF:
  3. Action Items:
  4. Issues:
  5. Reports:
    • Monitoring
  6. Run Plan: Run plan
  7. AOB

Friday, Sep 28 at 08:45

  1. Notes from the previous 24 hours:
    • Beam position erratic throughout the day & first half of swing day swing
    • Energy drift pathlength corrected
    • Sergey completed first set of DAQ tests
    • Stabilized mid-swing enough to attempt alignment but spot is huge 1.2 x 1.5mm
    • Aligned 0/90, still need to do 45/135
    • Collected 'production' data overnight, concerned about quality cobrems gui
    • Whiteboard camera improved
    • BOR records are back
  2. CEBAF:
    • Expect 2h downtime from 9am for HA to go to 2 pass; MCC will work on our optics during that time
  3. Action Items:
    • Update reference plots (CDC's new ref colz scale is off)
  4. Issues:
    • Beam
    • Network problems
    • Rootspy is often unable to find histos & make log entry, loses processes, need to start & stop monitoring w hdmongui.
      • Try start first. Open out the gui and count the # respawned processes, send info to David.
    • Plot browser fix in progress
  5. Reports:
  6. Run Plan: Run plan
    • Beam off at 9 for pass change
    • Sasha PS (Sat, 1h) and Richard TAGM threshold not done yet
    • Coordinate with C for TAC run - on or after Wed (otherwise need access), plan to install converter on Tuesday
    • Acc whiteboard
    • Counting house whiteboard
  7. AOB