(Thursday, September 10 at 8:45)
(Thursday, September 10 at 8:45)
Line 20: Line 20:
 
#*[https://logbooks.jlab.org/entry/3844610 New PWO crystals installed]
 
#*[https://logbooks.jlab.org/entry/3844610 New PWO crystals installed]
 
#*[https://logbooks.jlab.org/entry/3844871 Waiting for CCAL]
 
#*[https://logbooks.jlab.org/entry/3844871 Waiting for CCAL]
#*[https://logbooks.jlab.org/entry/3844762 5 pm Offsite Monitoring Report]
 
  
 
# Run plan
 
# Run plan
Line 28: Line 27:
 
#* Special tasks remaining:
 
#* Special tasks remaining:
 
#**Beam rastering test  
 
#**Beam rastering test  
#**Harp Scan (last one done on [https://logbooks.jlab.org/entry/3841546 Sept. 5th])
+
#**Periodic harp Scans (last one done on [https://logbooks.jlab.org/entry/3841546 Sept. 5th]). The rates and transmission [https://logbooks.jlab.org/entry/3845189 have been stable]
 
#**Empty target run?
 
#**Empty target run?

Revision as of 07:32, 10 September 2020

<- Back to Run Coordination Meetings:Summer2020

Integrated trigger count

GlueX Statistics Run Sheet


MEDCON 5 restrictions (Bob May email)

  1. adhere to counting room capacity restrictions
  2. maintain 6 ft. separation (briefly passing another person inside 6 ft. while moving about the counting room is inevitable and is OK)
  3. wear masks anytime more than one person present in the counting room
  4. at MEDCON 5 the lab has no cafeteria services because eating "cafeteria style" (eating in common from prepared food) is inconsistent with COVID-19 controls. Staging food in the counting room to share is inconsistent with MEDCON 5 COVID-19 controls.
  5. food and drink consumption - because it requires removing face coverings to consume - should be limited to packaged food and drink brought for personal use that is consumed while maintaining at least 6 ft. from the nearest person and ideally, consumed in a separate room from others.

Thursday, September 10 at 8:45

  1. Last 24 hours:
  1. Reports/issues:
  1. Run plan
    • Continue production runs
    • Tuesday Sept. 15th: 3h of beam study expected
    • Thursday or Friday Sept. 17th/18th: Hall C pass change from 5 to 1 pass
    • Special tasks remaining:
      • Beam rastering test
      • Periodic harp Scans (last one done on Sept. 5th). The rates and transmission have been stable
      • Empty target run?