=Friday, September 11 at 8:45=
 
=Friday, September 11 at 8:45=
 
# Last 24 hours:
 
# Last 24 hours:
 
 
# Reports/issues:
 
# Reports/issues:
 
#*Hall access by Lubomir during scheduled beam down time.
 
#*Hall access by Lubomir during scheduled beam down time.
 
 
# Run plan
 
# Run plan
 
#* Continue production runs
 
#* Continue production runs
Line 24: Line 22:
 
#* Tuesday Sept. 15th: 3h of beam study expected
 
#* Tuesday Sept. 15th: 3h of beam study expected
 
#* Thursday or Friday Sept. 17th/18th: Hall C pass change from 5 to 1 pass. We should request to run on our own slit.
 
#* Thursday or Friday Sept. 17th/18th: Hall C pass change from 5 to 1 pass. We should request to run on our own slit.
 
 
#* Special tasks remaining:
 
#* Special tasks remaining:
 
#**Periodic harp scans (last one done on [https://logbooks.jlab.org/entry/3841546 Sept. 5th]). The rates and transmission [https://logbooks.jlab.org/entry/3845189 have been stable]
 
#**Periodic harp scans (last one done on [https://logbooks.jlab.org/entry/3841546 Sept. 5th]). The rates and transmission [https://logbooks.jlab.org/entry/3845189 have been stable]
Line 33: Line 30:
 
=Thursday, September 10 at 8:45=
 
=Thursday, September 10 at 8:45=
 
# Last 24 hours:
 
# Last 24 hours:
 
 
# Reports/issues:
 
# Reports/issues:
 
#*[https://logbooks.jlab.org/entry/3844529 BCal hot channel] (Fixed by Sergey)
 
#*[https://logbooks.jlab.org/entry/3844529 BCal hot channel] (Fixed by Sergey)
 
#*[https://logbooks.jlab.org/entry/3844610 New PWO crystals installed]
 
#*[https://logbooks.jlab.org/entry/3844610 New PWO crystals installed]
 
#*[https://logbooks.jlab.org/entry/3844871 Waiting for CCAL]
 
#*[https://logbooks.jlab.org/entry/3844871 Waiting for CCAL]
 
 
# Run plan
 
# Run plan
 
#* Continue production runs
 
#* Continue production runs
Line 44: Line 39:
 
#* Tuesday Sept. 15th: 3h of beam study expected
 
#* Tuesday Sept. 15th: 3h of beam study expected
 
#* Thursday or Friday Sept. 17th/18th: Hall C pass change from 5 to 1 pass
 
#* Thursday or Friday Sept. 17th/18th: Hall C pass change from 5 to 1 pass
 
 
#* Special tasks remaining:
 
#* Special tasks remaining:
 
#**Beam rastering test  
 
#**Beam rastering test  
 
#**Periodic harp scans (last one done on [https://logbooks.jlab.org/entry/3841546 Sept. 5th]). The rates and transmission [https://logbooks.jlab.org/entry/3845189 have been stable]
 
#**Periodic harp scans (last one done on [https://logbooks.jlab.org/entry/3841546 Sept. 5th]). The rates and transmission [https://logbooks.jlab.org/entry/3845189 have been stable]
 
#**Empty target run?
 
#**Empty target run?

Revision as of 09:09, 10 September 2020

<- Back to Run Coordination Meetings:Summer2020

Integrated trigger count

GlueX Statistics Run Sheet


MEDCON 5 restrictions (Bob May email)

  1. adhere to counting room capacity restrictions
  2. maintain 6 ft. separation (briefly passing another person inside 6 ft. while moving about the counting room is inevitable and is OK)
  3. wear masks anytime more than one person present in the counting room
  4. at MEDCON 5 the lab has no cafeteria services because eating "cafeteria style" (eating in common from prepared food) is inconsistent with COVID-19 controls. Staging food in the counting room to share is inconsistent with MEDCON 5 COVID-19 controls.
  5. food and drink consumption - because it requires removing face coverings to consume - should be limited to packaged food and drink brought for personal use that is consumed while maintaining at least 6 ft. from the nearest person and ideally, consumed in a separate room from others.

Friday, September 11 at 8:45

  1. Last 24 hours:
  2. Reports/issues:
    • Hall access by Lubomir during scheduled beam down time.
  3. Run plan
    • Continue production runs
    • SRC trigger fine tuning. 2h A. Somov
    • Tuesday Sept. 15th: 3h of beam study expected
    • Thursday or Friday Sept. 17th/18th: Hall C pass change from 5 to 1 pass. We should request to run on our own slit.
    • Special tasks remaining:
      • Periodic harp scans (last one done on Sept. 5th). The rates and transmission have been stable
      • One last empty target run (2h)
      • Beam rastering test
      • Check CCal active basis with 2nA beam. 2h. A. Somov. To be scheduled when Hall C is at 1-pass, Hall A is down and we have our own slit.

Thursday, September 10 at 8:45

  1. Last 24 hours:
  2. Reports/issues:
  3. Run plan
    • Continue production runs
    • Large amount of beam trips due to Hall A beam steering problem. Beam will be down at (tentatively) 9am today for an expected 1 or 2h to address the problem.
    • Tuesday Sept. 15th: 3h of beam study expected
    • Thursday or Friday Sept. 17th/18th: Hall C pass change from 5 to 1 pass
    • Special tasks remaining:
      • Beam rastering test
      • Periodic harp scans (last one done on Sept. 5th). The rates and transmission have been stable
      • Empty target run?