Integrated trigger count

GlueX Statistics Run Sheet


MEDCON 5 restrictions (Bob May email)

  1. adhere to counting room capacity restrictions
  2. maintain 6 ft. separation (briefly passing another person inside 6 ft. while moving about the counting room is inevitable and is OK)
  3. wear masks anytime more than one person present in the counting room
  4. at MEDCON 5 the lab has no cafeteria services because eating "cafeteria style" (eating in common from prepared food) is inconsistent with COVID-19 controls. Staging food in the counting room to share is inconsistent with MEDCON 5 COVID-19 controls.
  5. food and drink consumption - because it requires removing face coverings to consume - should be limited to packaged food and drink brought for personal use that is consumed while maintaining at least 6 ft. from the nearest person and ideally, consumed in a separate room from others.

Monday, September 14 at 8:45

  1. Last 72 hours:
    • Production
    • On Friday, after being down since 2am (vacuum issue), the beam came back at 9am and was followed by a 2h empty target run (target was emptied during the beam down time)
    • Sunday swing: SRC trigger fine tuning + taking data with SRC trigger. 1 shift. A. Somov
  2. Reports/issues:
  3. Run plan
    • Continue production runs
    • Monday Sept. 14th: 10am-16:00: 6h of beam study. Access list:
      • Vladimir Berdnikov (PS area, 1h)??
    • Thursday or Friday Sept. 17th/18th: Hall C pass change from 5 to 1 pass. We should request to run on our own slit.
    • Special tasks remaining:
      • Periodic harp scans (last one done on Sept. 5th). The rates and transmission have been stable
      • Beam rastering test
      • Check CCal active basis with 2nA beam. 2h. A. Somov. To be scheduled when Hall C is at 1-pass, Hall A is down and we have our own slit.

Friday, September 11 at 8:45

  1. Last 24 hours:
    • Production, but RF recovery+NL troubles+vacuum issue resulted in only about 6h of useable beam.
    • Hall accesses by Lubomir (to reset a crate) and Mark D. (to fix non-working BCal pulser) during scheduled beam down time.
    • Hall access by Vladimir Berdnikov (PS area) to reinsert crystals and check communication.
  2. Reports/issues:
  3. Run plan
    • One last empty target run (2h) (current diamond radiator config., 350 nA)
    • Continue production runs
    • SRC trigger fine tuning + taking data with SRC trigger. 1 shift (Saturday swing). A. Somov
    • Monday Sept. 14th: 10am-16:00: 6h of beam study.
    • Tuesday Sept. 15th: due to All Hand Meeting at 9am, RC meeting is cancelled (unless something important happens).
    • Thursday or Friday Sept. 17th/18th: Hall C pass change from 5 to 1 pass. We should request to run on our own slit.
    • Special tasks remaining:
      • Periodic harp scans (last one done on Sept. 5th). The rates and transmission have been stable
      • Beam rastering test
      • Check CCal active basis with 2nA beam. 2h. A. Somov. To be scheduled when Hall C is at 1-pass, Hall A is down and we have our own slit.

Thursday, September 10 at 8:45

  1. Last 24 hours:
    • Production, with beam available for most of the day. A lot of beam trips however, which will be taken care of by impromptu RF recovery tomorrow.
  2. Reports/issues:
  3. Run plan
    • Continue production runs
    • Large amount of beam trips due to Hall A beam steering problem. Beam will be down at (tentatively) 9am today for an expected 1 or 2h to address the problem.
    • Tuesday Sept. 15th: 3h of beam study expected
    • Thursday or Friday Sept. 17th/18th: Hall C pass change from 5 to 1 pass
    • Special tasks remaining:
      • Beam rastering test
      • Periodic harp scans (last one done on Sept. 5th). The rates and transmission have been stable
      • Empty target run?