Run Planning Meeting Notes, September 17 - 21, 2020

From GlueXWiki
Jump to: navigation, search

<- Back to Run Coordination Meetings:Summer2020

Integrated trigger count

GlueX Statistics Run Sheet


MEDCON 5 restrictions (Bob May email)

  1. adhere to counting room capacity restrictions
  2. maintain 6 ft. separation (briefly passing another person inside 6 ft. while moving about the counting room is inevitable and is OK)
  3. wear masks anytime more than one person present in the counting room
  4. at MEDCON 5 the lab has no cafeteria services because eating "cafeteria style" (eating in common from prepared food) is inconsistent with COVID-19 controls. Staging food in the counting room to share is inconsistent with MEDCON 5 COVID-19 controls.
  5. food and drink consumption - because it requires removing face coverings to consume - should be limited to packaged food and drink brought for personal use that is consumed while maintaining at least 6 ft. from the nearest person and ideally, consumed in a separate room from others.

Monday, September 21 at 8:30am

  1. Last 72 hours
  2. Report/issue
  3. MEDCON5 Shutdown Plan
    • Shutdown started at 7am
      • Target empty
      • Ramp down solenoid
    • Controlled access at 7am on Monday, Sept. 21st, and restricted access around noon

Friday, September 18 at 8:30am

  1. Last 24 hours: 08:30 to 10:0010:00 to 16:0016:00 to 22:0022:00 to 04:0004:00 to 08:30
  2. Report/issue
    • Difficulty in nudging the coherent peak, Mark D. <<fitter only works in the near neighborhood, the GUI is zoomed far out by default and because there is a big time lag on the motion. Once you are nearby it pays to click once and then wait 30 seconds>>
    • FCAL PDUs rebooted
    • DAQ problem
  3. Run plan
    • Production
    • Check CCal active basis with 2nA beam. 2h. A. Somov. To be scheduled when Hall C is at 1-pass, Hall A is down and we have our own slit.
  4. MEDCON5 Shutdown Plan

Thursday, September 17 at 8:30am

  1. Last 24 hours:08:45 to 10:0010:00 to 16:0016:00 to 22:0022:00 to 04:0004:00 to 08:30
  2. Report/issue
  3. Run plan
    • Production
    • Tomorrow at 6am during the pass change, beam is expected to be down for less than 2hrs
    • Replace FCAL base
    • Check CCal active basis with 2nA beam. 2h. A. Somov. To be scheduled when Hall C is at 1-pass, Hall A is down and we have our own slit.