Difference between revisions of "Run Planning Meeting Notes, September 1 - September 7, 2022"

From GlueXWiki
Jump to: navigation, search
Line 21: Line 21:
 
* Last 24 hours from logbook
 
* Last 24 hours from logbook
 
** [ 0400-1000 05/09]
 
** [ 0400-1000 05/09]
** [ 2200-0400 04/09-05/09]
+
** [https://logbooks.jlab.org/entry/4037893 2200-0400 04/09-05/09]
** [ 1600-2200 04/09]
+
** [https://logbooks.jlab.org/entry/4037814 1600-2200 04/09]
 
** [https://logbooks.jlab.org/entry/4037713 1000-1600 04/09]
 
** [https://logbooks.jlab.org/entry/4037713 1000-1600 04/09]
 
** [https://logbooks.jlab.org/entry/4037625 0400-1000 04/09]
 
** [https://logbooks.jlab.org/entry/4037625 0400-1000 04/09]
Line 32: Line 32:
 
* [https://logbooks.jlab.org/entry/4037306 Out of date list of subsystem experts, some updates applied in the wiki]
 
* [https://logbooks.jlab.org/entry/4037306 Out of date list of subsystem experts, some updates applied in the wiki]
 
* [https://logbooks.jlab.org/entry/4037666], [https://logbooks.jlab.org/entry/4037662] Overnight FCAL issue caused by voltage changes.
 
* [https://logbooks.jlab.org/entry/4037666], [https://logbooks.jlab.org/entry/4037662] Overnight FCAL issue caused by voltage changes.
* Changes to subsystem settings and configurations should be recorded in a separate logbook entry at the time they are applied.  This helps shift crews to pin down the cause of any unexpected effects before calling the RC with a generic "there's somethng wrong with XYZ".
 
 
* Remote connection to counting room, remote shift takers should CHECK THEIR CONNECTION WELL IN ADVANCE OF THEIR FIRST SHIFT
 
* Remote connection to counting room, remote shift takers should CHECK THEIR CONNECTION WELL IN ADVANCE OF THEIR FIRST SHIFT
* Timekeeping, in person shift takers SHOULD ARRIVE IN TIME FOR THE START OF SHIFT, not 5-45 minutes after
 
  
 
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] ===  
 
=== [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2022.pdf Plan] ===  
 +
* Solenoid ramp-down
 +
** CDC/FDC off
 +
* Zero field runs
 +
* Target change Wednesday
  
 
= Sunday, September 4 =
 
= Sunday, September 4 =

Revision as of 23:16, 4 September 2022

Meetings are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)

MCC whiteboard

Hall D counting room white board

Hall D Logbook

Back to Run Coordination Meetings:Fall2022

Monday, September 5

Labor Day Holiday Special (9.30am, note one-off different time)

Weekend Run Updates


Issues from the weekend

Plan

  • Solenoid ramp-down
    • CDC/FDC off
  • Zero field runs
  • Target change Wednesday

Sunday, September 4

Saturday, September 3

Friday, September 2

Past 24 hours

Issues

  • Shift crew just reported that Ar and CO2 cylinders are low
  • DAQ issues late night
  • Hydra very slow updating last night (>10,000 seconds)

Plan

  • Intensity scan; 3 shifts each at 50nA and 100 nA, 12 shifts at 200 nA (almost 6 completed)
  • Trigger Studies
  • Access needed to restore target comms
  • Solenoid ramp down Monday, zero field runs Tuesday
  • Target change intended for Wednesday

Thursday, September 1

Past 24 hours

Issues

Plan

  • Brief accelerator downtime around 1pm for preventative maintenance on a UPS in the injector
  • Trigger study (Sasha)
  • Detector checkout (raw mode for ADCs & pi0 for FCAL)
  • Intensity scan?
  • Physics production
    • Take data with B-field (six shifts at 200 nA, then two each at 100 nA and 50 nA)

Further Information

The hot checkout page

Readiness Check List

  • Solenoid (Eugene/Beni)
    • Start the run with magnetic field on
  • Surveys (Tim/Mark)
    • FCAL survey
    • TOF survey
    • ST survey
    • TAGM
    • TAGH
    • Survey beamline component (secondary collimator, PS, beam pipe downstream the PS, etc.)
    • Survey CCAL after it's installed in the Hall
  • DAQ (Sergei).
    • Include CDC1, ST, and CCAL crates to the readout. Power the detector, continue taking cosmic data during the detector configuration change.
  • Trigger (Alex S.)
    • Check physics triggers
    • Run CCAL trigger when the detector is installed in the Hall
    • Connect / check CCAL LED and alpha triggers
  • Beam line
    • Install He beam pipe between FCAL and CCAL (Tim)
    • Install led shielding wall in front downstream the PS (Tim)
    • Radiator status
      • Check amorphous radiator
    • Tagger hodoscope (A. Somov)
      • Install plates with TAGH counters
      • Install / check repaired TAGH countes
    • Tagger microscope (Tim / Richard Jones)
      • Move TAGM to the new location and rotate
    • Collimator Motion (Hovanes)
      • Not changed
    • Active collimator detectors(Richard Jones/Alexandre Deur)
      • Move active collimator to 5 mm hole
      • Check
    • Profiler (Hovanes)
      • Not changed
    • Luminosity monitor (Hovanes)
      • Not changed
    • Halo monitors
      • Not changed
    • PS system (Alex Somov)
      • Not changed
    • Beam line magnets (PS magnet sweeping magnet and tagger quads).
      • Change filed of the PS magnet
    • Polarimeter (Sebastian Cole/M. Dugger)
      • Optional, not used in PrimEx
    • Targets (Chris/Tim/Alexandre D.)
      • LH4
      • Be
    • TAC (Alex Somov/Hovanes)
      • Use CCAL (TAC can be used as a backup)
    • Slow control (Hovanes)
      • Check CCAL
    • RF (Sergei)
      • Not changed
    • Radiation monitors (Alexandre D.)
      • Not changed
  • Detector systems
    • ST (Beni)
      • Connect cables, check dark rate
    • FDC (Lubomir)
      • Not changed
    • CDC (Beni)
      • Move CDC1 crate to the nominal position, cable up
      • Check readout
    • BCal (Mark D. / Elton)
      • Not changed
    • FCal (Mark D.)
      • Check / replace bases if needed
    • ComCal (Alex Somov)
      • Check detector controls (Nick)
      • Install CCAL platform
      • Check platform motion
      • Installed detector on the platform
      • Connect cables
      • Connect LMS
      • Check detector
    • TOF (Beni)
      • Remove inner acrylic absorber