Difference between revisions of "Run Planning Meeting Notes, September 23 - September 29, 2021"

From GlueXWiki
Jump to: navigation, search
(Monday, September 27)
(Monday, September 27)
Line 14: Line 14:
 
#** Remove absorber https://logbooks.jlab.org/entry/3911915
 
#** Remove absorber https://logbooks.jlab.org/entry/3911915
 
#** FCAL HV scan https://logbooks.jlab.org/entry/3912077 https://logbooks.jlab.org/entry/3912060
 
#** FCAL HV scan https://logbooks.jlab.org/entry/3912077 https://logbooks.jlab.org/entry/3912060
#** Beam back around 3 am (no beam during most of Friday)
+
#** Beam back around 3 am (Saturday and no beam during most of Friday)
 
#** Check radiation level https://logbooks.jlab.org/entry/3912307 https://logbooks.jlab.org/entry/3912195
 
#** Check radiation level https://logbooks.jlab.org/entry/3912307 https://logbooks.jlab.org/entry/3912195
 
#** HARP scan https://logbooks.jlab.org/entry/3912325 https://logbooks.jlab.org/entry/3912325 https://logbooks.jlab.org/entry/3912325
 
#** HARP scan https://logbooks.jlab.org/entry/3912325 https://logbooks.jlab.org/entry/3912325 https://logbooks.jlab.org/entry/3912325

Revision as of 19:14, 25 September 2021

<- Back to Run Coordination Meetings:Summer2021

Monday, September 27

  1. In last 72 hours:
  2. Issues
  3. Plan

Friday, September 24

  1. In last 24 hours:
  2. Issues
  3. Plan
    • Compton with Be target at low intensity

Thursday, September 23

  1. In last 24 hours:
  2. Issues
  3. Plan for the day
    • tagm studies by Richard
    • FDC straight track studies by Lubomir