Difference between revisions of "Run Planning Meeting Notes, September 23 - September 29, 2021"

From GlueXWiki
Jump to: navigation, search
(Monday, September 27)
(Monday, September 27)
Line 17: Line 17:
 
#** Check radiation level https://logbooks.jlab.org/entry/3912307 https://logbooks.jlab.org/entry/3912195
 
#** Check radiation level https://logbooks.jlab.org/entry/3912307 https://logbooks.jlab.org/entry/3912195
 
#** HARP scan https://logbooks.jlab.org/entry/3912325 https://logbooks.jlab.org/entry/3912325 https://logbooks.jlab.org/entry/3912325
 
#** HARP scan https://logbooks.jlab.org/entry/3912325 https://logbooks.jlab.org/entry/3912325 https://logbooks.jlab.org/entry/3912325
 +
#** Beam was off, asked to tune, FSD trip -> no beam until Monday
 
#* Saturday 8am to Sunday 8am summary:
 
#* Saturday 8am to Sunday 8am summary:
 
#** No beam from 10am to 7pm
 
#** No beam from 10am to 7pm

Revision as of 08:54, 26 September 2021

<- Back to Run Coordination Meetings:Summer2021

Monday, September 27

  1. In last 72 hours:
  2. Issues
  3. Plan

Friday, September 24

  1. In last 24 hours:
  2. Issues
  3. Plan
    • Compton with Be target at low intensity

Thursday, September 23

  1. In last 24 hours:
  2. Issues
  3. Plan for the day
    • tagm studies by Richard
    • FDC straight track studies by Lubomir