Difference between revisions of "Run Planning Meeting Notes, September 23 - September 29, 2021"

From GlueXWiki
Jump to: navigation, search
(Monday, September 27)
(Monday, September 27)
Line 2: Line 2:
 
=Monday, September 27=
 
=Monday, September 27=
 
# In last 72 hours:
 
# In last 72 hours:
#* Early Riser summary:
 
#* Owl summary:
 
 
#* Swing summary:https://logbooks.jlab.org/entry/3912624
 
#* Swing summary:https://logbooks.jlab.org/entry/3912624
 
#* Day summary: https://logbooks.jlab.org/entry/3912503
 
#* Day summary: https://logbooks.jlab.org/entry/3912503
Line 18: Line 16:
 
#** HARP scan https://logbooks.jlab.org/entry/3912325 https://logbooks.jlab.org/entry/3912325 https://logbooks.jlab.org/entry/3912325
 
#** HARP scan https://logbooks.jlab.org/entry/3912325 https://logbooks.jlab.org/entry/3912325 https://logbooks.jlab.org/entry/3912325
 
#** Beam was off, asked to tune, FSD trip -> no beam until Monday
 
#** Beam was off, asked to tune, FSD trip -> no beam until Monday
 +
#* Sunday 8am to Monday 8am summary: no beam
 
#* Saturday 8am to Sunday 8am summary:
 
#* Saturday 8am to Sunday 8am summary:
 
#** No beam from 10am to 7pm
 
#** No beam from 10am to 7pm

Revision as of 08:55, 26 September 2021

<- Back to Run Coordination Meetings:Summer2021

Monday, September 27

  1. In last 72 hours:
  2. Issues
  3. Plan

Friday, September 24

  1. In last 24 hours:
  2. Issues
  3. Plan
    • Compton with Be target at low intensity

Thursday, September 23

  1. In last 24 hours:
  2. Issues
  3. Plan for the day
    • tagm studies by Richard
    • FDC straight track studies by Lubomir