Difference between revisions of "Run Planning Meeting Notes, September 23 - September 29, 2021"

From GlueXWiki
Jump to: navigation, search
(Monday, September 27)
(Monday, September 27)
Line 17: Line 17:
 
#** Tagger NMR https://logbooks.jlab.org/entry/3912006 (Tim)
 
#** Tagger NMR https://logbooks.jlab.org/entry/3912006 (Tim)
 
#** z position of Be target https://logbooks.jlab.org/entry/3911950 (Simon)
 
#** z position of Be target https://logbooks.jlab.org/entry/3911950 (Simon)
#** Remove absorber https://logbooks.jlab.org/entry/3911915
+
#** Remove absorber https://logbooks.jlab.org/entry/3911915 (Steven/PrimEx-eta)
 
#** FCAL HV scan https://logbooks.jlab.org/entry/3912077 https://logbooks.jlab.org/entry/3912060
 
#** FCAL HV scan https://logbooks.jlab.org/entry/3912077 https://logbooks.jlab.org/entry/3912060
 
#** Beam back around 3 am (Saturday and no beam during most of Friday)
 
#** Beam back around 3 am (Saturday and no beam during most of Friday)

Revision as of 09:23, 26 September 2021

<- Back to Run Coordination Meetings:Summer2021

Monday, September 27

  1. In last 72 hours:
  2. Issues
  3. Plan
    • Maintenance
      • FCAL (Rebecca/Malte/Mark)
      • Swap one MPGD prototype under test with a new one (Kondo/Lubomir)

Friday, September 24

  1. In last 24 hours:
  2. Issues
  3. Plan
    • Compton with Be target at low intensity

Thursday, September 23

  1. In last 24 hours:
  2. Issues
  3. Plan for the day
    • tagm studies by Richard
    • FDC straight track studies by Lubomir